Great Yarmouth Borough Council Portal
No.Condition Text
1.Condition 12 requires that detailed plans of the roads, footways, and foul and surface water drainage are submitted to and approved in writing by the Local Planning Authority. The application is supported by the following documentation: - S38 Agreement Plan; drawing reference: C-150 P08 - S38 Agreement CBR Plan; drawing reference: C-153 P01 - Adoptable Road and Sewer Long Sections Sheet 1; drawing reference: C-250 P05 - Adoptable Road and Sewer Long Sections Sheet 2; drawing reference: C-251 P02 - Adoptable Road and Sewer Long Sections Sheet 3; drawing reference: C-252 P04 - Highway Construction Details - Sheet 1; drawing reference: C-400 P05 - Highways Construction Details - Sheet 2; drawing reference: C-401 P02 Sufficient information has been submitted to discharge the condition in PART. The condition can only be discharged in part as the development must take place in accordance with the approved details.