Great Yarmouth Borough Council Portal
No.Condition Text
1.[Before the commencement of development (or) Following demolition and site clearance but before the installation of below ground services (or) At the time of the first reserved matters application] details in written and drawn form of the means by which electric vehicle charging shall be made available for common parking areas within the scheme shall be submitted to and approved by the local planning authority. The works shall accord to the approved scheme and shall be retained thereafter The reason for the condition is: -To allow provision for the demand for electric vehicle charging within the lifetime of the development.
2.No works above slab level shall take place until a statement demonstrating how the dwelling will be designed and built to achieve a water consumption rate of no more than 110 litres/person/day has been first submitted to and approved in writing by the Local Planning Authority. All required water conservation measures within the approved details shall thereafter be installed and maintained to achieve this agreed rate to ensure the required water consumption is not exceeded for the lifetime of the development. The reason for the condition is: - In the interests of promoting and securing water efficiency improvements to a higher standard than Building Regulations minimum standards require, to accord with adopted Local Plan Part 2 policy E7. Note to applicant - The imposition of this planning condition requires the development to achieve a higher standard of construction than the current minimum national requirement through Building Regulations. This requires you / the Developer to ensure that the standard is adhered to when seeking Building Regulations Completion Notice approval (whether using local authority inspectors or third party approved inspectors).