No.Condition Text
1.Condition 22 of outline pp 06/19/0676/O required detailed designs of a surface water drainage scheme for that phase incorporating the following measures to be submitted to and agreed with the Local Planning Authority. The following information was submitted: Technical Approval Certificate - Independent water Networks - Dated 15/1/25 Technical Approval Certificate - Independent water Networks - Dated 15/1/2 FW Network 01 - Dated December 2024 - Received by the Local Planning Authority on 22nd September 2025 SW Network 01 - Dated December 2024 - Received by the Local Planning Authority on 22nd September 2025 Drawing No: 47932-RJL-XX-XX-DR-C-0050- Revision :P3 - Title: ENGINEERING LAYOUT - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0070- Revision: P3- Title: S104 PLAN - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0071-Revision: P2- Title: S104 PLAN - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0075-Revision: P3-Title: RISING MAIN SETTING OUT - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0200-Revision: P3- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0201-Revision: P2- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0202-Revision: P3- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0203-Revision: P3- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0204-Revision: P3- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 -Drawing No: RJL-XX-XX-DR-C-0205-Revision: P2- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0206-Revision: P2- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0207-Revision: P3- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0208-Revision: P2- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0209-Revision: P2- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0210-Revision: P2- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0211-Revision: P2- Title: ENGINEERING LONGSECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0300-Revision: P2- Title: MANHOLE SCHEDULES - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0301-Revision: P3- Title: MANHOLE SCHEDULES - Received by the Local Planning Authority on 22nd September 2025 -Drawing No: RJL-XX-XX-DR-C-0302-Revision: P3- Title: MANHOLE SCHEDULES - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0303-Revision: P4- Title: MANHOLE SCHEDULES - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0304-Revision: P3- Title: MANHOLE SCHEDULES - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0305-Revision: P2- Title: MANHOLE SCHEDULES - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0306-Revision: P2- Title: MANHOLE SCHEDULES - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0307-Revision: P2- Title: MANHOLE SCHEDULES - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0500- Title: ADOPTABLE DRAINAGE CONSTRUCTION DETAILS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-0501-Revision: P2- Title: ADOPTABLE DRAINAGE CONSTRUCTION DETAILS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-1000-Revision: P3- Title: PRIVATE DRAINAGE GA - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-1001-Revision: P3- Title: PRIVATE DRAINAGE GA - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-1002-Revision: P3- Title: PRIVATE DRAINAGE GA - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-1003-Revision: P3- Title: PRIVATE DRAINAGE GA - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-1200-Revision: P2- Title: BASIN SECTIONS - Received by the Local Planning Authority on 22nd September 2025 Drawing No: RJL-XX-XX-DR-C-1800-Revision: P3- Title: IMPERMEABLE AREAS PLAN - Received by the Local Planning Authority on 22nd September 2025 Drainage Design Statement - REV D-final. Part 1 - Dated April 2023 - Received by the Local Planning Authority on 24th September 2025 Drainage Design Statement - REV D-final. Part 2 - Dated April 2023- Received by the Local Planning Authority on 24th September 2025 Drainage Design Statement - REV D-final. Part 3 - Dated April 2023- Received by the Local Planning Authority on 24th September 2025 Drainage Design Statement - REV D-final. Part 4 - Dated April 2023- Received by the Local Planning Authority on 24th September 2025 Drainage Design Statement - REV D-final. Part 5 - Dated April 2023- Received by the Local Planning Authority on 24th September 2025 Drainage Design Statement - REV D-final. Part 6 - Dated April 2023- Received by the Local Planning Authority on 24th September 2025 Drainage Design Statement - REV D-final. Part 7 - Dated April 2023- Received by the Local Planning Authority on 24th September 2025 Drainage Design Statement - REV D-final. Part 8 - Dated April 2023- Received by the Local Planning Authority on 24th September 2025 Drainage Design Statement - REV D-final. Part 9 - Dated April 2023- Received by the Local Planning Authority on 24th September 2025 Upon full assessment of the submitted material supporting the application, taking into account all material considerations, the submitted details listed above are considered to meet the requirements of condition 22 and are hereby approved and the condition can be discharged in PART for Phase 1A ONLY. The development shall be built in accordance with the approved drainage scheme and maintained in accordance thereafter, for Phase 1 ONLY