| No. | Condition Text |
|---|---|
| 1. | Condition 23 of outline pp 06/19/0676/O requires submission of details of foul drainage. The following document was received on the 9th January 2024: - Drainage Design Statement; prepared by Richard Jackson The following further plans were received on the 22nd April 2024: - Engineering Layout; 47932-RJL-XX-XX-DR-C-0050-P3 - Engineering Layout; 47932-RJL-XX-XX-DR-C-0051-P3 - S38 Plan; 47932-RJL-XX-XX-DR-C-0060-P3 - S38 Plan; 47932-RJL-XX-XX-DR-C-0061-P3 - S104 Plan; 47932-RJL-XX-XX-DR-C-0070-P3 - S185 Rising Main Setting Out; 47932-RJL-XX-XX-DR-C-0075-P3 - S185 Rising Main Diversion Plan; 47932-RJL-XX-XX-DR-C-0080-P1 - S185 Rising Main Diversion Setting Out; 47932-RJL-XX-XX-DR-C-0081-P1 - S185 Rising Main Diversion Longsection; 47932-RJL-XX-XX-DR-C-0082-P1 - S185 Rising Main Diversion Longsection; 47932-RJL-XX-XX-DR-C-0083-P1 - S185 Rising Main Diversion Longsection; 47932-RJL-XX-XX-DR-C-0084-P1 - S185 Rising Main Diversion Construction Details; 47932-RJL-XX-XX-DR-C-0085-P1 - Highway Horizontal Setting Out; 47932-RJL-XX-XX-DR-C-0100-P3 - Junction Setting Out; 47932-RJL-XX-XX-DR-C-0110-P4 - Junction Setting Out; 47932-RJL-XX-XX-DR-C-0111-P1 - Engineering Longsections; 47932-RJL-XX-XX-DR-C-0200-P3 - Engineering Longsections; 47932-RJL-XX-XX-DR-C-0202-P3 - Engineering Longsections; 47932-RJL-XX-XX-DR-C-0203-P3 - Engineering Longsections; 47932-RJL-XX-XX-DR-C-0204-P3 - Engineering Longsections; 47932-RJL-XX-XX-DR-C-0207-P3 - Manhole Schedules; 47932-RJL-XX-XX-DR-C-0301-P3 - Manhole Schedules; 47932-RJL-XX-XX-DR-C-0302-P3 - Manhole Schedules; 47932-RJL-XX-XX-DR-C-0303-P4 - Manhole Schedules; 47932-RJL-XX-XX-DR-C-0304-P3 - Adoptable Highway Construction Details; 47932-RJL-XX-XX-DR-C-0400-P2 - Adoptable Highway Construction Details; 47932-RJL-XX-XX-DR-C-0401-P2 - Adoptable Highway Construction Details; 47932-RJL-XX-XX-DR-C-0402-P2 - Adoptable Highway Construction Details; 47932-RJL-XX-XX-DR-C-0403-P2 The details are considered acceptable and are hereby approved and enable partial discharge of this condition insofar as they relate to the foul drainage only, for Phase 1a only. The development must now take place and be managed in accordance with the details hereby approved. |