No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the following plans received by the Local Planning Authority on the 30th October 2023: - Location Plan - Site Plan, dwg. ref. HSG001 A103 Rev 1 - Drainage Plan, dwg. ref. HSG001 A106 Rev 1 - Floor Plans 1, dwg. ref. HSG001 A101 Rev 1 - Floor Plans 2, dwg. ref. HSG001 A102 Rev 1 - Elevations 1, dwg. ref. HSG001 A104 Rev 1 - Elevations 2, dwg. ref. HSG001 A105 Rev 1 The reason for the condition is:- For the avoidance of doubt.
3.The materials to be used in the external walls and roof of the development hereby permitted shall match those of the existing building, except for the ground floor of the east elevation which is proposed to be rendered, as in accordance with the details stated in the application form. The reason for the condition is :- In the interests of the visual amenities of the area.
4.Asbestos Note: The developer is reminded that prior to any refurbishment commencing on site the building/s to be refurbished are required to be surveyed for the presence of asbestos containing materials in accordance with the Control of Asbestos Regulations 2012. Any asbestos containing materials which are identified shall be managed or removed in accordance with the above regulations and waste regulations. Failure to comply with these regulations could result in prosecution by the relevant authority. The uncontrolled refurbishment of buildings could result in the contamination of soils on site and in the vicinity of the demolition. This could cause the investigation of the site under Part 2A of the Environmental Protection Act 1990, which may result in the determining of the site as Contaminated Land. For further help and advice in respect of asbestos removal the applicant/agent is advised to contact the Health and Safety Executive (HSE) on 0845 345 0055 (www.hse.gov.uk/asbestos)
5.Construction noise notification: The applicant is strongly recommended to advise neighbouring businesses and residential occupiers of the proposals, including any periods of potentially significant disturbance e.g. demolition or piling, together with contact details in the event of problems.
6.Hours of Work: Due to the close proximity of other residential dwellings and/or businesses, the hours of any construction or refurbishment works that are audible outside of the boundary of the site should be restricted to reduce the likelihood of noise disturbance to: 0730 hours to 1830 hours Monday to Friday 0830 hours to 1330 hours Saturdays No work on Sundays or Bank Holidays.
7.NOTE: The responsibility for the safe development and secure occupancy of the site rests with the developer. The local planning authority has determined the application on the basis of the information available to it, but this does not mean that the land is free from contamination, or that the land could not be declared Contaminated Land in future.
8.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.