1.The development must be begun before the expiry of 3 years from the date of this decision. Reason: Required to be imposed by section 18 of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by Section 51 of the Planning and compulsory Purchase Act 2004
2.The development shall be carried out in accordance with the following plans and details received on the 27th December 2023 under application 06/23/0719/LB: 225-PP-01 Site Location 225-PP-23-D Ground Floor Plan - Proposed Amendment 225-PP-24-E First Floor Plan- Proposed Amendment 225-PP-25-A Roof Plan - Proposed Amendment 225-PP-26-A North Elevation - Proposed Amendment 225-PP-27-A South Elevation - Proposed Amendment 225-PP-28-D East Elevation - Proposed Amendment 225-PP-29-A West Elevation - Proposed Amendment And in accordance with the following plans and details provided approved under listed building consent 06/20/0643/LB: 225-PP-32 Sections Drawing Rev. 225-PP-33-A Section through showing services received 19 January 2021 225-PP-43 to 50 Construction drawings 225-PP-61 to 63 North Side Extension details. Reason: For the avoidance of doubt.
3.During the works, if hidden historic features or archaeology are revealed they should be retained in-situ. Works shall be halted in the relevant area of the building and the Local Planning Authority should be notified immediately. Reason: To ensure that historic features are recorded and preserved as part of the special character of the Listed Building.
4.Before construction of the following elements proceed, further details of these discrete elements of the design shall be submitted to and approved in writing by the Local Planning Authority: · The balcony internally and the raised platform externally (including appropriate structural calculations; · Exterior lighting; · New external joinery for the east gable fenestration; · The formation of the new openings to the walls including lintels, making good, etc.; and, · The position, type and method of installation of all new services and related fixtures (including rainwater goods, communications and information technology servicing). The development shall thereafter be undertaken in strict accordance with the details as approved and in accordance with the details received within permission 06/23/0719/LB. Reason: To preserve the character of the listed historic building.
5.The materials to be used in making good any defects or repairs shall match the original materials as closely as possible, and where new openings are formed, they shall be recovered for reuse and the mortar type and mix shall match that originally used, including aggregate type, binder and pointing finish. Reason: To preserve the character of the listed historic building.
6.All original external and internal historic features, part of the special character of the heritage asset (including buttresses, brickwork, joinery of historic importance, etc) should be preserved and protected from any damage throughout the works. Any damaged fabric should be repaired in a like for like manner with relevant matching materials and techniques. Reason: To ensure that regard is paid to protecting the special architectural and historic interest and integrity of the building under Section 16 of the Planning (Listed Buildings and Conservation Areas) Act 1990.
7.There shall be no installation of any plant and machinery within the development until full details of the specification, appearance and methods of installation and openings required into the listed building have first been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be undertaken in strict accordance with the approved plans. Reason: In the interests of preserving character and appearance of the listed building and setting of the conservation area in accordance with policies CS10 & E5.
8.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.