Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than 14th April 2024. Reason: Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004 and to ensure commencement begins within the same timescales as required by the original parent planning permission 06/20/0642/F.
2.The development shall be carried out in accordance with the following amended plans received under this variation of conditions application (06/23/0647/VCF) on the 27th December 2023: Amended Plans Approved under 06/23/0647/VCF: · 225-PP-01 Site Location · 225-PP-23-D Ground Floor Plan - Proposed Amendment · 225-PP-24-E First Floor Plan - Proposed Amendment · 225-PP-25-A Roof Plan - Proposed Amendment · 225-PP-26-A North Elevation - Proposed Amendment · 225-PP-27-A South Elevation - Proposed Amendment · 225-PP-28-D East Elevation - Proposed Amendment · 225-PP-29-A West Elevation - Proposed Amendment and the approved plans submitted under 06/20/0642/F listed below: · 225-PP-32 Sections Drawing · Rev. 225-PP-33-A Section through showing services received 19 January 2021 · 225-PP-43 to 50 Construction drawings · 225-PP-61 to 63 North Side Extension details. Reason: For the avoidance of doubt.
3.The development hereby permitted shall be carried out throughout the construction phase in strict accordance with the approved Flood Plan details which were submitted to and approved by the Local Planning Authority as part of condition discharge application 06/22/0499/CD, and shall thereafter be operated in accordance with the Flood Plan for the duration of the use of the development. Reason: To ensure that mitigation measures are undertaken as the property is located within an area at risk of flooding.
4.During the works, if hidden historic features or archaeology are revealed they should be retained in-situ. Works shall be halted in the relevant area of the building and the Local Planning Authority should be notified immediately. Reason: To ensure that historic features are recorded and preserved as part of the special character of the Listed Building.
5.Before construction of the following elements proceed, further details of these discrete elements of the design shall be submitted to and approved in writing by the Local Planning Authority: · The balcony internally and the raised platform externally (including appropriate structural calculations; · Exterior lighting; · New external joinery for the east gable fenestration; · The formation of the new openings to the walls including lintels, making good, etc.; and, · The position, type and method of installation of all new services and related fixtures (including rainwater goods, communications and information technology servicing). The development shall thereafter be undertaken in strict accordance with the details as approved and in accordance with the details received within permission 06/23/0647/VCF. Reason: To preserve the character of the listed historic building
6.The materials to be used in making good any defects or repairs shall match the original materials as closely as possible, and where new openings are formed, they shall be recovered for reuse and the mortar type and mix shall match that originally used, including aggregate type, binder and pointing finish. Reason: To preserve the character of the listed historic building.
7.All original external and internal historic features, part of the special character of the heritage asset (including buttresses, brickwork, joinery of historic importance, etc) should be preserved and protected from any damage throughout the works. Any damaged fabric should be repaired in a like for like manner with relevant matching materials and techniques. Reason: To ensure that regard is paid to protecting the special architectural and historic interest and integrity of the building under Section 16 of the Planning (Listed Buildings and Conservation Areas) Act 1990.
8.The Phase II contamination assessment, submitted to and approved by the Local Planning Authority under 06/22/0499/CD, shall be carried out in accordance with the approved details. Reason: To enable maintenance/renovations of the units and for the Local Planning Authority to retain control over the use of the units for holiday accommodation
9.In the event contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until: 1) A report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified; and, 2) The agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
10.Construction work shall not take place outside the following hours:- 8:00 to 18:00 Mondays to Fridays, 8:30 to 13:30 Saturdays, And no work shall take place on Sundays, Public or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property) Reason: In the interests of the residential amenities of the occupiers of nearby dwellings.
11.The following measures shall be employed to protect air quality: · A supply of water shall be available sufficient for supressing dust; · Mechanical cutting equipment with integral dust suppression shall be used; · There shall be no burning of any materials on site. Reason: The site has the potential to generate a significant amount of dust during the construction process.
12.Before first use a noise report and mitigation strategy to BS4142 demonstrating that noise is to within acceptable limits as defined by the World Health Organisation is sufficiently attenuated with regard to amplified music and other performance related noise sources, shall be submitted in written form to the Local Planning and subsequently approved by them. The works shall be affected on site where necessary in accordance with the findings of the noise report and mitigation strategy. Reason: To protect residential amenity with regard to noise.
13.There shall be no installation of any plant and machinery within the development until full details of the specification, appearance and methods of installation and openings required into the listed building have first been submitted to and approved in writing by the Local Planning Authority. â¿¿ The development shall thereafter be undertaken in strict accordance with the approved plans.â¿¿ Reason: In the interests of preserving character and appearance of the listed building and setting of the conservation area in accordance with policies CS10 & E5.
14.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
15.NOTES - The applicant will need an environmental permit for flood risk activities if they want to do work in, under, over or within 8 metres (m) from a fluvial main river and from any flood defence structure or culvert or 16m from a tidal main river and from any flood defence structure or culvert. The Tidal River Yare is designated a 'main river'