| No. | Condition Text |
|---|
| 1. | The development must be begun not later than 18th July 2024.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the following plans received by the Local Planning Authority on 6th September 2023:
- Plan No. ARC 2203-100- 05 B, entitled Elevations and section as proposed, Dated April 23
- Plan No. ARC 2203-100- 04 B, entitled Plans as proposed (submitted as floor and roof plan), Dated April 23
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | Construction work shall not take place outside the following hours:-
07:00 to 18:30 Monday to Friday
08:30 to 13:30 Saturdays
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 4. | In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until:
1) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and
2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority.
The reason for the condition is :-
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 5. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |
| 6. | NOTES - Please read the following notes carefully:-
Advisory Note -
The applicant is strongly recommended to advise neighbouring businesses and residential occupiers of the proposals, including any periods of potentially significant disturbance e.g. demolition or piling, together with contact details in the event of problems.
Disclaimer re contamination -
NOTE: The responsibility for the safe development and secure occupancy of the site rests with the developer. The local planning authority has determined the application on the basis of the information available to it, but this does not mean that the land is free from contamination, or that the land could not be declared Contaminated Land in future.
Local Air Quality -
The site will potentially generate a significant amount of dust during the construction process; therefore, the following measures should be employed:
· An adequate supply of water shall be available for suppressing dust;
· Mechanical cutting equipment with integral dust suppression should be used;
· There shall be no burning of any materials on site, or burial of asbestos, which should instead be removed by an EA licenced waste carrier, and the waste transfer notes retained as evidence. |