Great Yarmouth Borough Council Portal
No.Condition Text
1.The requirement to provide submitted details for Condition 14(A) has been addressed and the development must proceed in strict accordance with the details presented in the submitted document: "Construction Environmental Method Statement by Tilbury Douglas, ref 100239 Revision D dated 15/03/2023". The condition is therefore discharged. Sufficient information to discharge the condition has been submitted and is approved. The submitted details address policies CS11, GSP5 and E6 and are considered acceptable. The development must be undertaken in accordance with the following details: - Letter dated 05 December 2022, ref: CES/PU6277/DC/Con14(a); - Tilbury Douglas Material Movement Plan and Remediation Strategy Revision 3, ref: 100239 received 14.02.2023; - Construction Environmental Method Statement by Tilbury Douglas, ref 100239 Revision D dated 15/03/2023, received 16/03/2023. NOTES TO APPLICANT AND DEVELOPER: (1) Natural England advise that: .Vibro piling should be used as standard, percussive piling should only be used if needed to drive a pile to its design depth. A soft-start procedure should be used if percussive piling is required. .Natural England is satisfied that the that proposed methods are acceptable as presented in the attached MS 001 Construction Environmental Method Statement rev D to discharge condition 14a. .Further general advice on the consideration of protected species and other natural environment issues is provided at the Natural England Standing Advice Annex A document, submitted to the LPA on 28/07/23. (2) In accordance with condition 14 Part (b) - No works of site clearance or construction within the development hereby permitted shall commence until the site has first been surveyed by a qualified Ecologist for the purpose of identifying nesting birds and protected species within or adjoining the site. Where such birds or species are found, appropriate mitigation measures shall be installed to avoid disturbance, or to provide relocation as appropriate. Areas within the application site which are not subject to development works within this permission shall be protected by the installation of an appropriate development exclusion zone, and shall not be used for the purposes of storage, parking or other activities associated with construction of operation of the development hereby permitted. (3) In accordance with condition 14 Part (c) - The development shall be undertaken in strict accordance with the biodiversity mitigation measures presented within Table 6-2 of the approved Construction Environment Management Plan (CEMP) (dated May 2021), including: pollution prevention measures, noise disturbance measures, air quality, sedimentation and breeding bird protection measures. Where breeding bird and marine mammal checks are proposed in the CEMP these shall be undertaken and submitted to the Local Planning Authority within 1 month of the completion of each survey.