Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the following plans and documents received by the Local Planning Authority on 6th March 2023: - Plan No. 1767/1 revision Rev.A(Dec.'22)1/Front elevations added, entitled Planning Drawing (submitted as Site Location Plan, Block Plan, Elevations Plan, Floor Plans) Dated November 2022 - Tree Report by Farmland Forestry dated 27 February 2023 The reason for the condition is:- For the avoidance of doubt.
3.The materials to be used in the external walls and roof of the development hereby permitted shall match those of the existing building in accordance with the details stated in the application form. The reason for the condition is :- In the interests of the visual amenities of the area.
4.All approved tree protection measures (detailed by reference in Section 6 Arboricultural Method Statement (AMS); Tree Protection Plan (TPP) in Appendix 1; and Temporary Fencing in Appendix 2 in the submitted Tree Report) are to be carried out/installed prior to the commencement of development work to implement this planning permission. The approved tree protection measures are to be maintained in good condition and adhered to throughout the construction period. Unless otherwise agreed in writing by the Local Planning Authority, no construction-related activities (for example: storage and/or siting of: vehicles, fuel, materials, site huts or other buildings or ancillary equipment; raising of lowering of ground levels; installation of underground services, drains; lighting of fires etc.) may be undertaken within the identified Construction Exclusion Zones and fenced areas. In the event that any tree(s) become damaged during construction, the Local Planning Authority shall be notified, and remedial action agreed and implemented. In the event that any tree(s) dies or is removed without the prior approval of the Local Planning Authority, it shall be replaced within the first available planting season, in accordance with details to be agreed with the Local Planning Authority. The reason for the condition is :- To ensure existing trees are protected during site works in the interests of the visual amenity of the area and the satisfactory appearance of the development in accordance with Policy E4 of Great Yarmouth Local Plan Part 2.
5.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.