| 1. | Condition 12 of 06/21/0415/F states:
"No works of excavation or construction of the replacement sea wall and quay heading in the areas referred to as 'Enhanced Berth 1 for Crew Transfer Vessels (CTVs) and Operational Vessels' and 'Additional pontoon facilities for smaller CTVs' on the Proposed Site Layout drawing ref: 003 Revision P05, shall be undertaken until precise details of the works to the sea wall and quay and details of piling works or foundations thereto have first been submitted to and approved in writing by the Local Planning Authority. Thereafter, the development shall be carried out in accordance with the approved details.
The reason for the condition is:-
To ensure appropriate construction to minimise disruption to vessels, flood risk protection, and in the interests of protection of the marine environment, protected species and protected waters.
Note to applicant - the developer is reminded that statutory consultees the Environment Agency recommend the use of vibro-piling as their preferred approach, and if not possible it is recommended to consider soft-start piling."
The requirement to provide submitted details for Condition 12 has been fully discharged. Sufficient information to discharge the condition has been submitted and is approved. The submitted details address policies CS11, GSP5 and E6 and are considered acceptable.
The development must be undertaken in accordance with the following details:
.Letter dated 15 July 2022, ref: CES/PU2918/DC/Con12
.79505-WSP-XX-ZZ-DR-CV-11000 rev C01 - Berth 1 General Arrangement Plan
.79505-WSP-XX-ZZ-DR-CV-11001 rev C01 - Berth 1 Cross Section A-A
.79505-WSP-XX-ZZ-DR-CV-11002 rev C01 - Berth 1 Quay Wall Plan received 25.11.22
.79505-WSP-XX-ZZ-DR-CV-11004 rev C01 - Berth 1 Waling Beam and Anchor Wall Details
.79505-WSP-XX-ZZ-DR-CV-11005 rev C01 - Berth 1 Capping Beam Reinforcement Details
.79505-WSP-XX-ZZ-DR-CV-11006 rev C01 - Berth 1 Pile Connection Details
.79505-WSP-XX-ZZ-DR-CV-11008 rev C01 - Berth 1 Bollard and Ladder Details
.79505-WSP-XX-ZZ-DR-CV-11009 rev C01 - Berth 1 Fender Details
.79505-WSP-XX-ZZ-DR-CV-11016 rev C01 - Berth 1 Retaining Wall Details
.79505-WSP-XX-ZZ-DR-CV-11017 rev C01 - Berth 1 Firewater Details (sheet 1 of 2) (hydrants etc)
.79505-WSP-XX-ZZ-DR-CV-11018 rev C01 - Berth 1 Firewater Details (sheet 2 of 2) (hydrants etc)
.79505-WSP-XX-ZZ-DR-CV-11019 rev C01 - Berth 1 Electric Pit Details
.79505-WSP-XX-ZZ-DR-CV-11020 rev C01 - Berth 1 Cross Section B-B
.79505-WSP-XX-ZZ-DR-CV-11021 rev C01 - Berth 1 Cross Section C-C
.79505-WSP-XX-ZZ-DR-CV-11022 rev C01 - Berth 1 Cross Section D-D
.79505-WSP-XX-ZZ-DR-CV-11023 rev C01 - Berth 1 Location of Existing Tanks
.79505-WSP-XX-ZZ-DR-CV-11024 rev C01 - Berth 1 Section 1 Through Existing Tanks
.79505-WSP-XX-ZZ-DR-CV-12000 rev C01 - Berth 75 Proposed Layout
.79505-WSP-XX-ZZ-DR-CV-12001 rev C01 - Berth 75 Long Sections A-A & B-B
.79505-WSP-XX-ZZ-DR-CV-12002 rev C01 - Berth 75 Approach Details
.79505-WSP-XX-ZZ-DR-CV-12003 rev C01 - Berth 75 Bankseat and Pile Cap Details
.2139-BRL-01-XX-DR-C-1000 rev P01 - Berth 75 CTV Berth Proposed 3D Site View
.2139-BRL-01-XX-DR-C-1001 rev P01 - Berth 75 Proposed Layout General Arrangement
.2139-BRL-01-XX-DR-C-1002 rev P01 - Berth 75 CTV Berth Sections
Advisory Note:
The applicant and developer are reminded by the Local Planning Authority and Environment Agency that:
(i) Notwithstanding that a flood risk activity permit has been submitted and permit EPR/BB3059MZ granted on 12/08/2022, any additional works to those included in the permit, or changes to the proposal, will need to be considered separately.
(ii) With regards to the connection of the 'Links span' the Environment Agency notes that the Bank seat bearing shown on DWG12003 Detail 2 will require modification of the concrete capping associated with the flood defence. The Environment Agency states that you will need to demonstrate the proposal will not diminish the flood protection behind the asset.
(iii) The development must also be undertaken in strict accordance with the marine environment protection measures required by Conditions 13, 14 and 19 of the permission 06/21/0415/F: the development shall be undertaken in accordance with an approved Construction Environmental Management Plan, under the supervision of a Ecological Clerk of Works, and with suitable ecological protection measures. |