| No. | Condition Text |
|---|
| 1. | The development must be begun not later than the 19th August 2024.
The reason for the condition is:-
Required to be imposed pursuant to Section 18 of the Planning (Listed Building and Conservation Areas) Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the following plans received by the Local Planning Authority on:
24th October 2022:
. Block Plan Drawing No. 22-1572-01
. Location and Site Plan Drawing No. 22-1572-02
14 February 2023:
. Unit 1 and 2 Floor Plans Drawing No.22-1572-03
. Unit 4 Floor Plans Drawing No.22-1572-04
. Unit 3 Drawing No. 22-1572-05 Rev A
and the development shall be carried out in accordance with the following plans and drawings submitted as part of application 06/20/0705/LB:
Whole Site Elevations: (19-113) 0214 rev B, received 27 July 2021.
Unit 1 - Elevations: (19-113) 0206 rev D, received 12 July 2021.
Unit 2 - Elevations: (19-113) 0208, received 22 January 2021.
Unit 3 - Elevations: (19-113) 0210 rev B, received 27 July 2021.
Unit 4 - Elevations: (19-113) 0212 rev A, received 12 July 2021.
Cart shed - Plans and Elevations: (19-113) 0213 rev D, received 27 July 2021
and the works shall be carried out in accordance with the details of biodiversity, materials, joinery, services and other interventions submitted as part of the approved discharge of condition application 06/22/0897/CD.
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | All original external and internal historic features, part of the special character of the heritage asset (including buttresses, brickwork, joinery of historic importance, etc) should be preserved and protected from any damage throughout the works. Any damaged fabric should be repaired in a like for like manner with relevant matching materials and techniques.
The reason for the condition is:-
To ensure that regard is paid to protecting the special architectural and historic interest and integrity of the building under Section 16 of the Planning (Listed Buildings and Conservation Areas) Act 1990 |
| 4. | All the new external and internal repair works to the retained fabric shall match the existing adjacent historic work with regard to the methods, materials, colour, texture and profile. Newly added brickwork should match the quality of the existing and should be laid in lime mortar. Any re-pointing should also be carried out in matching lime mortar.
The reason for the condition is:- To ensure that the used materials and finishes are appropriate for the character and appearance of the Listed building. |
| 5. | During the works, if hidden historic features or archaeology are revealed they should be retained in-situ. Works shall be halted in the relevant area of the building and the Local Planning Authority should be notified immediately. Development in the same area of the building shall only re-commence when the Local Planning Authority has confirmed in writing that suitable measures for recording and / or preserving the historic features have been completed.
The reason for the condition is:-
To ensure that historic features are recorded and preserved as part of the special character of the Listed Building. |
| 6. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |