Great Yarmouth Borough Council Portal
No.Condition Text
1.The development hereby approved shall be completed by 10th December 2023. The reason for the condition is:- The condition is imposed in order to comply with the requirements of paragraph 3 of Class Q.2 to Part 3 of schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
2.The development shall be carried out in accordance with the application form and the following plans and documents: a) Drawing Number 6138 02, entitled Proposed Plan, Elevations and Sections, dated AUG 2020 as approved under 06/20/0533/PAD; b) Double Pantile Concrete Tile specification by Crest Nelskamp Roofing Tiles (unreferenced and undated); c) Refurbishment/Pre-Demolition Survey of Asbestos Materials at Nursery Barn, Rollesby Road, Fleggburgh, NR29 3AR (unreferenced), by East Coast Insulations, dated 05/10/2022; d) Method of Work for Removal (unreferenced, unauthored and undated); e) Covering letter from applicant confirming no plans have been changed, just the roof material, dated 6th October 2022. The reason for the condition is:- In order to comply with the requirements of paragraph W (12) of Part 3 of schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015.
3.The development shall be undertaken in accordance with the submitted Refurbishment/Pre-Demolition Survey of Asbestos Materials (East Coast Insulations, dated 05/10/2022) and Method of Work for Removal (unreferenced, unauthored and undated). The reason for the condition is:- To ensure that the development is carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy E6 of the adopted Great Yarmouth Local Plan Part 2 (2021).
4.The roof tiles to be used in the development hereby permitted shall be double pantiles in Onyx Black. The reason for the condition is:- For the avoidance of doubt and in the interests of protecting the character and appearance of the area in accordance with Policies CS9 and CS10 of the adopted Great Yarmouth Core Strategy (2015) and Policies A2 and E5 of the adopted Great Yarmouth Local Plan Part 2 (2021).
5.In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until: a) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified; and b) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority. The reason for the condition is :- To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy E6 of the adopted Great Yarmouth Local Plan Part 2 (2021).
6.INFORMATIVE: STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
7.Further help and advice in respect of asbestos removal can be obtained from the Health and Safety Executive (HSE) on 0845 345 0055 (www.hse.gov.uk/asbestos).