| No. | Condition Text |
|---|---|
| 1. | Condition 4 states - No works above slab level shall take place until a statement demonstrating how the dwelling will be designed and built to achieve a water consumption rate of no more than 110 litres/person/day has been first submitted to and approved in writing by the Local Planning Authority. All required water conservation measures within the approved details shall thereafter be installed and maintained to achieve this agreed rate to ensure the required water consumption is not exceeded for the lifetime of the development. Assessment: The submitted Water Efficiency Design document specifies water consumption in accordance with The Building Regulations Approved Document G Table 2.2 Maximum fittings consumption optional requirement level, and this is hereby approved and satisfies the submission part of this condition. The development shall be carried out in accordance with these details as approved and retained/maintained as such thereafter. |
| 2. | Condition 5 states - Before the commencement of development details in written and drawn form of the means by which electric vehicle charging for the three smaller 2 bedroom dwellings shall be made available for frontage parking areas within the scheme shall be submitted to and approved by the local planning authority. The works shall accord to the approved scheme and shall be retained thereafter Assessment: The electric vehicle charging details as contained on submitted Elevation Plan Drawing No. 007 P01 are hereby approved and satisfy the submission part of this condition. The development shall be carried out in accordance with these details as approved and retained/maintained as such thereafter. |
| 3. | Condition 6 states - Before work commences further details of the measures to prevent harm to the protected tree belt to the east of the site shall be provided in writing to the Local Planning Authority. These shall include details of the permanent boundary fencing to the curtilages with details to indicate how fence posts shall be positioned to avoid harms to roots where in root protection areas including methodology for installation. The works shall accord to the agreed scheme and whether temporary or permanent be put in place before other work proceeds. No building materials shall be stored within the root protection areas. Assessment: The details contained on the following three submitted Drawings are hereby approved and satisfy the submission part of this condition: Drawing Numbers CP1 P03 - Tree belt protection plan; BT1 P03 - Boundary treatments; and BT2 P01 - Boundary treatments. The development shall be carried out in accordance with these details as approved and permanent works shall be retained/maintained as such thereafter. |