| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the following plans received by the Local Planning Authority:
- Location Plan - Drawing No 2202-01 Received by the Local Planning Authority on the 1st July 2022
- Site Plan - Drawing No 2202-02 Received by the Local Planning Authority on the 1st July 2022
- Proposed Site Plan - 22218 Drawing No 01-02 Revision C2 Received by the Local Planning Authority on the 1st July 2022
- Plan & Elevations - Drawing Reference AG-22-Scantech Offshore Ltd-01 Received by the Local Planning Authority on the 1st July 2022
- Floor Slab General Arrangement - 22218 Drawing No 03 Revision C2 Received by the Local Planning Authority on the 1st July 2022
- Substructures Sections & Details - 22218 Drawing No 04 Revision C2 Received by the Local Planning Authority on the 1st July 2022
- Surface Water Drainage Details - 22218 Drawing No 101 Revision C1 Received by the Local Planning Authority on the 1st July 2022
- Contextual Elevations - Drawing No 2202-03 Received by the Local Planning Authority on the 29th September 2022
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | The materials to be used in the external walls and roof of the development hereby permitted shall match those of the details stated in the application form and plans.
The reason for the condition is :-
In the interests of the visual amenities of the area. |
| 4. | Prior to the first occupation/use of the development hereby permitted the proposed on-site car parking area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is: -
To ensure the permanent availability of the parking/manoeuvring areas, in the interests of satisfactory development and highway safety. |
| 5. | If, during development, contamination not previously identified is found to be present, then no further development shall be carried out in pursuance of this permission until a scheme has been submitted to and approved by the Council as Local Planning Authority detailing how this contamination shall be dealt with in accordance with the remediation scheme as set out above. Only when evidence is provided to confirm the contamination no longer presents an unacceptable risk, can development continue.
The reason for the condition is :-
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors, in accordance with section 179 of the NPPF. |
| 6. | NOTES - Please read the following notes carefully:-
Construction noise notification:
The applicant is strongly recommended to advise neighbouring businesses and residential occupiers of the proposals, including any periods of potentially significant disturbance e.g. demolition or piling, together with contact details in the event of problems.
Air Quality- Construction:
The site will potentially generate a significant amount of dust during the construction process; therefore, the following measures should be employed:
- An adequate supply of water shall be available for suppressing dust;
- Mechanical cutting equipment with integral dust suppression should be used;
- There shall be no burning of any materials on site, or burial of asbestos, which should instead be removed by an EA licenced waste carrier, and the waste transfer notes retained as evidence.
Internal Drainage Board:
The applicant is advised to read the comments submitted by Waveney, Lower Yare and Lothingland Drainage Board in regards to their bylaws and the proposed works potentially requiring Land Drainage Consent from the Board. |
| 7. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria set out in Local core Strategy adopted policies CS06, CS13, CS16 and Local Plan Part 2 adopted policies GSP1, B1 and I1. |
| 8. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |