| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the following approved plans and details:
Location plan XX 00 DR A00000 SO Rev 02;
Proposed Roof plan RP DR A 10111 SO Rev 01;
Drainage Plan GF-DR-A-10113-SO Rev 02;
as received by the Local Planning Authority on 17/06/2022; and,
Proposed Site Plan XX-00-DR-A-10001-SO Rev 05;
Proposed Elevations-XX-DR-A-30310-SO Rev 06;
Proposed Ground Floor Plan GF-DR-A-10110-SO Rev 09;
as received by the Local Planning Authority on 22/08/2022.
Note: drawing PJ5370 / M01 received January 2021 is relevant for location of fire hydrant only.
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | The materials to be used in the external walls and roof of the development hereby permitted shall be in accordance with the details stated in the application form and shown on the approved plans.
The reason for the condition is :-
In the interests of the visual amenities of the area. |
| 4. | There shall be no installation, use or assembly of the Mitsubishu No.'19 PAC-DB-311 air conditioning unit(s), or any other air conditioning or extraction units on the western elevation of the building, until such time as an acoustic barrier has first been installed around the air conditioning units on the building and not on the site boundary, in accordance with details of an acoustic barrier to be first provided to and approved in writing by the Local Planning Authority. The acoustic barrier shall be sufficient to restrict the noise level from the units such that the background level is not exceeded by more than 5dB at the western boundary.
The details provided shall identify the background noise level of the area with particular reference to the residential properties to the west and the acoustic barrier shall be located close to the air conditioning unit on the building and not on the site boundary.
No additional air conditioning units associated with the building shall be installed without the prior written consent of the Local Planning Authority.
Reason for the condition:
To protect the amenities of the occupiers of the dwellings that adjoin the school boundary to the west in accordance with Policy A1 of the Local Plan Part 2 (2021) as it is considered that a 5dB increase at the boundary would not have a significant impact on residents but a level in excess of 5dB may be unacceptable. |
| 5. | No development shall take place until there has first been submitted to and approved by the Local Planning Authority a scheme of landscaping, which shall include the location of replacement planting of 4 trees (native species) to replace the trees that are to be removed or displaced by the approved development.
The reason for the condition is:-
In the interests of the visual amenities, biodiversity and ecology of the locality. |
| 6. | The fire hydrant shown on Plan PJ5370 / M01 shall be installed and made operational prior to the first use of the building hereby approved.
The reason for the condition is: -
In the interest of public safety. |
| 7. | Any external lighting to be installed shall accord with the Collingwood Lighting details for WL95 IP65 10-15W Wattage and Colour Switchable Bulkhead which was submitted in support of the application. No additional external lighting associated with the building shall be installed without first receiving the prior written consent of the Local Planning Authority.
The reason for the condition is:-
For the avoidance of doubt and to ensure that the amenity of local residents is not significantly harmed by reason of light pollution. |
| 8. | Construction work shall not take place outside the following hours:-
- 0730 hours to 1830 hours Monday to Friday,
- 0830 hours to 1330 hours Saturdays, and,
- No work on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings, due to the close proximity of other residential dwellings and businesses. |
| 9. | NOTES - Please read the following notes carefully:-
The site will potentially generate a significant amount of dust during the construction process; therefore, the following measures should be employed:
- An adequate supply of water shall be available for suppressing dust;
- Mechanical cutting equipment with integral dust suppression should be used;
- There shall be no burning of any materials on site, or burial of asbestos, which should instead be removed by an EA licenced waste carrier, and the waste transfer notes retained as evidence. |
| 10. | Construction noise notification:
The applicant is strongly recommended to advise neighbouring businesses and residential occupiers of the proposals, including any periods of potentially significant disturbance e.g. demolition or piling, together with contact details in the event of problems. |
| 11. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |