No.Condition Text
1.The development must be begun not later than 3 years beginning with the date of this permission. The reason for the condition is:- Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the application form and following plans: a) Location Plan (Drawing Number 13664-LP-576, dated 09.02.2022); b) Proposed Site Layout (Drawing Number 13664-P02-576 Rev A, dated 17.10.2022) received on 18th October 2022; c) EV Charger details (Drawing Number 13664-P03-576 Rev A, dated 19.10.2022), received on 19th October 2022; d) Substation elevations (Drawing Number 13664-P04-576, dated 09.02.2022); e) Document Reference EC19697-2, entitled Technical Memorandum Noise Impact Assessment, by Environmental Equipment Corporation Ltd, dated 15 December 2022, received on 15th December 2022; f) Document Reference 22077-FRA-TN-01 P01, entitled Technical Note Flood Risk Assessment, by Water Environment Limited, dated 19/08/2022. The reason for the condition is:- For the avoidance of doubt.
3.No development shall take place until there has been submitted to and approved in writing by the Local Planning Authority a scheme of landscaping, which shall include indications of all existing trees and hedgerows on the land, and details of any to be retained, removed, replaced or reinstated elsewhere on site. The landscaping scheme shall include details of the new landscaping to be installed, including the size and species of new trees, grass, shrub or herbaceous areas and any other landscaping features forming part of the scheme. A schedule The reason for the condition is:- In the interests of the visual amenities of the locality in accordance with Policy CS9 of the adopted Great Yarmouth Local Plan Core Strategy (2015) and Policy A1 of the adopted Great Yarmouth Local Plan Part 2 (2021).
4.Prior to the first use of the development hereby permitted, a flood management plan shall be submitted to and agreed in writing with the Local Planning Authority. This flood management plan shall include information regarding the availability of the Environment Agency's "Floodline Warnings Direct" flood warning scheme, and set out how the proposed infrastructure will be protected to enable the safe shut down of the site prior to evacuation. The flood management plan shall be made available to all staff and users of the site. The reason for the condition is :- To minimise the risk to the staff and users in the event of flooding in accordance with Policy CS13 of the adopted Great Yarmouth Local Plan Core Strategy and Policy E1 of the adopted Great Yarmouth Local Plan Part 2 (2021).
5.If, during development, contamination not previously identified is found to be present, then no further development shall be carried out in pursuance of this permission until a remediation strategy has been submitted to and approved in writing by the Local Planning Authority detailing how this contamination shall be dealt with. The remediation strategy shall be implemented as approved. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors, in accordance with section 179 of the NPPF (2021) and to protect and prevent the pollution of the water environment (particularly the Secondary A and Principal aquifers) from potential pollutants associated with current and previous land uses in line with National Planning Policy Framework (NPPF 2021; paragraphs 174, 183 and 184), EU Water Framework Directive, Anglian River Basin Management Plan and Environment Agency Groundwater Protection Position Statements (2017) A4 - A6, J1 - J7 and N7.
6.Construction work shall not take place outside the following hours:- 07:30 to 18:30 Mondays 07:30 to 18:30 Tuesdays 07:30 to 18:30 Wednesdays 07:30 to 18:30 Thursdays 07:30 to 18:30 Fridays 07:30 to 18:30 Saturdays and no work shall take place on Sundays or Bank Holidays. These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property. The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings in accordance with Policy Policy A1 of the adopted Great Yarmouth Local Plan Part 2 (2021).
7.NOTES - Please read the following notes carefully:- Due the current use of the site and the presence of highly flammable products, there is an increased risk of explosion. The contractors must be aware of the location of all pipework, fuel tanks and vent pipes prior to construction.
8.NOTES - Please read the following notes carefully:- The applicant is strongly recommended to advise neighbouring businesses and residential occupiers of the proposals, including any periods of potentially significant disturbance e.g. demolition or piling, together with contact details in the event of problems.
9.NOTES - Please read the following notes carefully:- The applicant is advised that the proposal has to meet the necessary requirements of the Local Licencing Authority for Petroleum Enforcement for Fire Safety purposes.