| No. | Condition Text |
|---|
| 1. | ---------------------------------------------------------------------------------------------------------------------- Particulars of planning permission reserving details for approval:- Application No.:- 06/19/0195/O: Sub division of plot and construction of 1 bedroom bungalow with parking /turning space and new access.
---------------------------------------------------------------------------------------------------------------------- Particulars of details submitted for approval:- Appearance, scale, and landscaping. |
| 2. | The development shall be carried out in accordance with the following revised plans (drawing 02 Rev.A) received by the Local Planning Authority on the 19th May 2022.
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | No works above slab level shall take place until a statement demonstrating how the dwelling will be designed and built to achieve a water consumption rate of no more than 110 litres/person/day has been first submitted to and approved in writing by the Local Planning Authority. All required water conservation measures within the approved details shall thereafter be installed and maintained to achieve this agreed rate to ensure the required water consumption is not exceeded for the lifetime of the development.
The reason for the condition is: -
In the interests of promoting and securing water efficiency improvements to a higher standard than Building Regulations minimum standards require, to accord with adopted Local Plan Part 2 policy E7.
Note to applicant - The imposition of this planning condition requires the development to achieve a higher standard of construction than the current minimum national requirement through Building Regulations. This requires you / the Developer to ensure that the standard is adhered to when seeking Building Regulations Completion Notice approval (whether using local authority inspectors or third party approved inspectors). |
| 4. | No occupation of the dwelling hereby permitted shall occur until details in written and drawn form of the means by which electric vehicle charging shall be made available for parking areas within the scheme have been submitted to and approved by the local planning authority. The works shall accord to the approved scheme and shall be retained thereafter
The reason for the condition is: -
To allow provision for the demand for electric vehicle charging within the lifetime of the development. |
| 5. | Prior to the first occupation of the development hereby permitted the vehicular access shall be constructed in accordance with the highways specification (TRAD 5, attached) and thereafter retained at the position shown on the approved plan. Arrangements shall be made for surface water drainage to be intercepted and disposal of separately so that it does not discharge from or onto the highway.
The reason for the condition is :-
To ensure construction of a satisfactory access and to avoid carriage of extraneous material or surface water from or onto the highway in the interest of highway safety. |
| 6. | Prior to the first occupation of the development hereby permitted visibility splays shall be provided in full accordance with the details indicated on the approved plan (Drg No 02 Rev.A).The Splays shall thereafter be maintained at all times free from any obstruction exceeding 1.05 metres above the level of the adjacent highway carriageway.
The reason for the condition is :-
In the interest of highway safety in accordance with the principles of the NPPF. |
| 7. | Prior to the first occupation/use of the development hereby permitted the proposed access, on-site car parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking/manoeuvring areas, in the interest of satisfactory development and highway safety. |
| 8. | The approved planting scheme as shown on drawing 02 Rev.A shall be carried out in its entirety within the first planting and growing season following the first occupation of the dwelling hereby permitted. For the duration of a period of 10 years from the first occupation of the dwelling, any trees, shrubs or hedges planted in accordance with the landscaping scheme which die, are removed or become seriously damaged or diseased shall be replaced in the next immediate planting season with others of similar size and species, unless the Local Planning Authority gives its first written consent to any variation thereof.
The reason for the condition is :-
To ensure an high quality form of development and in the interests of ensuring appropriate visual amenity for the local area, to enhance biodiversity and to secure appropriate residential amenity. |
| 9. | No occupation of the dwelling hereby permitted shall occur until no fewer than 1no. swift terrace box has been installed on the west facing gable in its entirety. The bird box shall remain in perpetuity.
The reason for the condition is :-
To secure biodiversity enhancements in line with the NPPF. |
| 10. | Construction work shall not take place outside the following hours:-
08:00 to 18:00 Mondays
08:00 to 18:00 Tuesdays
08:00 to 18:00 Wednesdays
08:00 to 18:00 Thursdays
08:00 to 18:00 Fridays
08:30 to 13:30 Saturdays
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 11. | In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until:
1) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and
2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority.
The reason for the condition is :-
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 12. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any amendment revoking or re-enacting that Order) the dwelling hereby permitted shall not be further extended in any way, or any outbuilding erected, without first obtaining the express written permission of the Local Planning Authority.
The reason for the condition is:-
To enable the Local Planning Authority to retain control over any further extensions to the dwelling in the interests of residential amenity. |
| 13. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the aims of core policies CS09 and CS11. |
| 14. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
It is confirmed that this shadow HRA submitted by the applicant has been assessed as being suitable for the Borough Council as competent authority to use as the HRA record for the determination of the planning application, in accordance with the Conservation of Habitats and Species Regulations 2017.
In this instance the Borough Council has considered there is no likely significant effect on protected habitats arising solely from the development itself; and the development would contribute to the overall in-combination significant adverse effect identified by the Habitats Regulations Assessment Report for the Local Plan Core Strategy, but this effect can be adequately mitigated by the Habitats Monitoring and Mitigation Strategy; and that Strategy requires a payment of £185.93 per each additional dwelling towards the monitoring and mitigation provided through that Strategy. |
| 15. | NOTES - Please read the following notes carefully:-
Please be aware it is the applicants' responsibility to clarify the boundary with the public highway. Private structures such as fences or walls will not be permitted on highway land. The highway boundary may not match the applicants title plan. Please contact the highway
research team at highway.boundaries@norfolk.gov.uk for further details. |
| 16. | NOTES - Please read the following notes carefully:-
As per the outline planning permission, the applicant is reminded that any pre-commencement conditions must be discharged and then commencement must take place within 2 years of this approval of reserved matters. |
| 17. | NOTES - Please read the following notes carefully:-
Great Yarmouth Borough Council has a duty to ensure that roads and streets within the Borough are properly named and that the properties fronting onto them are appropriately numbered. Therefore it is essential that once planning permission has been granted, and prior to the completion of development, the developer/owner applies for an official address. This Authority has adopted the legislation set out in sections 17, 18 and 19 of The Public Health Act 1925. In common with most neighbouring local authorities, Great Yarmouth Borough Council is introducing charging for the street naming and numbering of new developments from the 1st January 2020. Charges and more information can be seen on the Council's website here: https://www.great-yarmouth.gov.uk/street-naming-numbering |