Great Yarmouth Borough Council Portal
No.Condition Text
1.Condition 3 for Plots 71-77 for provision of electric vehicle charging infrastructure discharged with regard to pre-occupation requirements by the partial and un-referenced drawing showing the affected area of common parking court in the south east corner of the site provided on 12.5.22 which shows pull through ducts. Full discharge will be achieved by provision of the agreed infrastructure on site and will not require a further discharge application.
2.Condition 4 for woodland walks is discharged in regard to pre-occupation requirements by the drawing 19/113-21 Revision B received 12.5.22 Full discharge will be achieved by provision of the agreed infrastructure on site and will not require a further discharge application.
3.Condition 5 is discharged with regard to information to be provided before construction proceeds beyond damp proof course level by the drawings submitted for the affected units showing mechanical extract to the side of the property away from the major highway as confirmed by the Environmental Services email of 4 May 2022 and the Blake landscape drawings showing close boarded fences around the plots . Full discharge will be achieved by provision of the agreed infrastructure on site and will not require a further discharge application.
4.Condition 6 for safety confirmation independently of the suds feature as required by the LLFA is now withdrawn from this submission. The applicant has agreed to omit this condition and apply to discharge it separately. This is because parts of the site to the west and south are being built out and offered for sale and the suds basin is within the active construction site at present so there is no current risk to the public. On that basis the LPA would not enforce breach of the condition at the present juncture allowing the necessary information on risk and methods to be submitted and independently reviewed.
5.Condition 8 for enhanced water consumption management is discharged with regard to pre-occupation requirements by the calculations of water provided for all properties. Full discharge will be achieved by provision of the agreed infrastructure on site and will not require a further discharge application.
6.Condition 9 was applied for as discharged but is a removal of permitted rights condition that will endure. By agreement with the applicant it is removed from the list.
7.Condition 10 required details of the materials to be used, is discharged, with regard to pre-commencement aspects, by the materials plan drawing LVP MP-01 revision C2 received 3 May 2022. Full discharge will be achieved by provision of the agreed infrastructure on site and will not require a further discharge application.
8.Condition 11 for the design of the substation is discharged by the drawing reference GTC-E-SS-0012-R2-1 received 3 May 2022. This condition is regarded as fully discharged as the building is already erected so this discharge is effectively retrospective.