1.The development must be begun not later than 12th May 2024, being the expiry of three years from the date of the original permission reference 06/21/0199/F. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the revised originally submitted plans for application reference 06/21/0199/F plan references 1465.3 revision A received by the Local Planning Authority on 29 April 2021 and original drawing 1465.5 received 30 March 2021 and variation drawing for plot 2 marked as drawing 1465/6 received by the Local Planning Authority on 21 January 2022. The reason for the condition is :- For the avoidance of doubt.
3.No development shall take place within the site to which this permission relates until a programme of archaeological work has first been carried out in accordance with a written statement of investigation which shall have first been submitted to, and approved in writing by the Local Planning Authority. The reason for this condition is :- To enable investigation and recording of this site of archaeological interest to take place during the period of building or engineering works.
4.No development shall take place within the site until the applicant, or their agents or successors in title, has:- a) caused to be implemented a programme of archaelogical evaluation in accordance with a first written scheme of investigation which has been submitted to and approved in writing by the Local Planning Authority; and next b) submitted the results of the archaelogical evaluation to the Local Authority; and next c) secured the implementation of a programme of archaeological mitigatory work in accordance with a second written scheme of investigation which has been submitted to and approved in writing by the Local Planning Authority; and next, if the mitigatory work consists of a further investigation d) submitted a formal legal contract with an archaeological contractor, which has also been approved in writing by the Local Planning Authority. Such a contract will deal with all the details contained in the approved detailed second written scheme of investigation including post-excavation assessment, analysis, archiving and publication of results. The reason for the condition is :- In order to enable investigation and recording of this site of archaeological interest to take place during the period of building or engineering works.
5.No works shall commence on the site until such time as detailed plans of the roads, footways, street lighting, foul and surface water drainage have been submitted to and approved in writing by the Local Planning Authority. All construction works shall be carried out in accordance with the approved plans. The reason for the condition is: - This needs to be a pre-commencement condition to ensure fundamental elements of the development that cannot be retrospectively designed and built are planned for at the earliest possible stage in the development and therefore will not lead to expensive remedial action and adversely impact on the viability of the development.
6.With the exception of demolition, no development shall commence until a Phase 1 contamination report has first been carried out to assess whether the land is likely to be contaminated, and the results of the investigations submitted to and approved in writing by the Local Planning Authority. The report to be submitted shall also include details of known previous uses and possible contamination arising from those uses. If contamination is suspected to exist, a Phase 2 site investigation is to be carried out to the satisfaction of the Local Planning Authority in consultation with the Environmental Health service. If the Phase 2 site investigation determines that the ground contains contaminants at unacceptable levels then the applicant is to submit a written strategy detailing how the site is to be remediated to a standard suitable for its proposed end-use. This subsequent report shall be submitted to and approved in writing by the Local Planning Authority before the commencement of construction works. No buildings hereby permitted shall be occupied until the remediation works agreed within the scheme have first been carried out to the written satisfaction of the Local Planning Authority, following submission of a remediation verification report. The reason for the condition is :- To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
7.In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until: 1) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and 2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority. The reason for the condition is :- To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
8.There shall be no residential occupation of the final dwelling hereby constructed until all works shall have been carried out on roads/footways/street lighting/foul and surface water sewers in accordance with the approved specification to the satisfaction of the Local Planning Authority. The reason for the condition is: - To ensure satisfactory development of the site and to ensure estate roads are constructed to a standard suitable for adoption as public highway.
9.Before any dwelling is first occupied the road(s)/footway(s) shall be constructed to binder course surfacing level from the dwelling to the adjoining County road in accordance with the details to be approved in writing by the Local Planning Authority. The reason for the condition is: - To ensure satisfactory development of the site.
10.Prior to the first occupation/use of the development hereby permitted visibility splays measuring 2.4 metres x 43 metres shall be provided to each side of the access where it meets the highway. The splay(s) shall thereafter be maintained at all times free from any obstruction exceeding 0.225 metres above the level of the adjacent highway carriageway. The reason for the condition is: - In the interests of highway safety in accordance with the principles of the NPPF.
11.Prior to the first occupation of the development hereby permitted the proposed access, on-site car parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. The reason for the condition is: - To ensure the permanent availability of the parking/manoeuvring areas, in the interests of satisfactory development and highway safety.
12.Where not already provided, the north boundary of the site shall feature close boarded fences of a height of 2m height. The reason for the condition is :- To ensure neighbour's privacy.
13.Before the development is brought into use further written details of the means to reduce Water consumption to below 110 litres per person per day shall be submitted to and approved by the Local Planning Authority and the works subsequently carried out before occupation in accordance with the agreed details. The reason for the condition is :- To accord with LPP2 policy E7.
14.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any amendment revoking or re-enacting that Order) there shall be no roof-lights, dormers or roof windows of any sort in the north facing roof slope towards neighbours on Woodlands Close, of the varied bungalow type hereby permitted without first obtaining the express written permission of the Local Planning Authority. The reason for the condition is:- In the interests of residential (privacy) amenity.
15.This development involves work to the public highway that will require the approval of the County Council as Highway Authority. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Area Managers based at (insert appropriate area contact details). Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.
16.Before construction commences a Preliminary Ecological Appraisal shall be submitted to the local Planning Authority in writing and approved by the LPA in writing subsequently. The PEA shall identify opportunities for ecological mitigation and enhancement. The works shall proceed in accordance with the assessment's strategy. The reason for the condition is :- To ensure the mitigation of harm to ecology.
17.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. It is confirmed that this shadow HRA submitted by the applicant has been assessed as being suitable for the Borough Council as competent authority to use as the HRA record for the determination of the planning application, in accordance with the Conservation of Habitats and Species Regulations 2017. In this instance the Borough Council has considered there is no likely significant effect on protected habitats arising solely from the development itself; and the development would contribute to the overall in-combination significant adverse effect identified by the Habitats Regulations Assessment Report for the Local Plan Core Strategy, but this effect can be adequately mitigated by the Habitats Monitoring and Mitigation Strategy; and that Strategy requires a payment of £110 per each additional dwelling towards the monitoring and mitigation provided through that Strategy.