| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2. | The materials to be used in the external walls of the development hereby permitted shall match those of the existing building in accordance with the details stated in the application form.
The reason for the condition is :-
In the interests of the visual amenities of the area. |
| 3. | The development shall be carried out in accordance with the following plans:
Location plan,
Plan 4 - ground floor,
Plan 5 - proposed side elevations
plan 5a Proposed front and rear elevations,
Plan 6 - section
Plan 7 - Block Plan
all received by the Local Planning Authority on 06th January 2022.
The reason for the condition is:-
For the avoidance of doubt. |
| 4. | Due to the proximity of other residential dwellings and businesses, the hours of any construction or refurbishment works should be restricted to:
· 0730 hours to 1830 hours Monday to Friday
· 0830 hours to 1330 hours Saturdays
· No work on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 5. | NOTES - Please read the following notes carefully:-
Local Air Quality:
The site will potentially generate a significant amount of dust during the construction process; therefore, the following measures should be employed:
· An adequate supply of water shall be available for suppressing dust.
· Mechanical cutting equipment with integral dust suppression should be used.
· There shall be no burning of any materials on site, or burial of asbestos, which should instead be removed by an EA licenced waste carrier, and the waste transfer notes retained as evidence. |
| 6. | NOTES - Please read the following notes carefully:-
Informative regarding Asbestos:
The developer must carry out an asbestos survey prior to demolition of the kitchen extension to identify asbestos containing materials (ACMs). The developer has a legal duty to remove most ACMs before demolition and some ACMs must be removed by contractors licensed by the Health and Safety Executive (HSE). If at any stage during demolition asbestos is suspected the work should be stopped and the material investigated.
Removal and disposal of asbestos containing materials must be carried out in accordance with HSE Approved Guidance Procedures. |
| 7. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria for domestic additions set out in adopted policy H9 of the Local Plan Part 2. |
| 8. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |