| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the following plans - 1667/1 - received by the Local Planning Authority on the 12th November 2021.
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | No part of the proposed structure (to include fascia board/rainwater guttering) shall overhang or encroach upon highway land, no gate/door/ground floor window shall open outwards over the highway and no guttering or down pipe shall discharge water directly or indirectly onto highway.
The reason for the condition is: -
In the interests of highway safety. |
| 4. | The materials shall match those of the existing building in accordance with the details stated in the application form.
The reason for the condition is :-
In the interests of the visual amenities of the area. |
| 5. | Construction work shall not take place outside the following hours:-
07:30 to 18:30 Mondays
07:30 to 18:30 Tuesdays
07:30 to 18:30 Wednesdays
07:30 to 18:30 Thursdays
07:30 to 18:30 Fridays
08:30 to 13:30 Saturdays
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 6. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria for domestic additions set out in adopted policy H9 of the Local Plan Part 2. |
| 7. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |
| 8. | NOTES - Please read the following notes carefully:-
The site will potentially generate a significant amount of dust during the conversion process; therefore, the following measures should be employed: -
- An adequate supply of water shall be available for suppressing dust;
- Mechanical cutting equipment with integral dust suppression should be used;
- There shall be no burning of any materials on site. |
| 9. | NOTES - Please read the following notes carefully:-
It is the Applicant's responsibility to clarify the boundary with the public highway. Private structures such as fences, or walls will not be permitted on highway land. The highway boundary may not match the applicant's title plan. For further details please contact the highway research team at highway.boundaries@norfolk.gov.uk |
| 10. | NOTES - Please read the following notes carefully:-
This planning permission shall not be taken as to convey, confer or imply any permission to carry out any works on land not within the applicants ownership or control, no part of the building should overhang adjoining property. |
| 11. | NOTES - Please read the following notes carefully:-
The applicant is reminded that they have a legal duty to remove most Asbestos Containing Materials (ACMs) before development and some ACMs must be removed by contractors licensed by the Health and Safety Executive. If at any stage during the development asbestos is suspected the work should be stopped and the material investigated. |