| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is:-
Required to be imposed pursuant to Section 18 of the Planning (Listed Building and Conservation Areas) Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the plans 77.002 location plan, 77.102 First floor plan, 77.104 Third floor plan, 77.105 Elevations, received by the Local Planning Authority on 1 September 2021, and revised plans 77.101 revision C Ground floor plan, and 77.103 revision A Second floor plan, received by the Local Planning Authority on 23 September 2021.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | (a) No demolition works shall be undertaken associated with outbuildings abutting the Hippodrome listed building until the applicant has first undertaken a structural survey conducted by a suitably qualified person to establish whether the Hippodrome relies on these structures for support either by original design or as a result of the passage of time.
(b) In the event that the Hippodrome does rely on these outbuildings for support, either wholly or in part, the survey shall propose means to support, rectify or mitigate the proposed loss of support, and evidence how this will be achieved. Measures shall be provided prior to the commencement of demolition.
(c) The survey report shall include details of how demolition will include making good any alterations or damage to the listed building fabric, and shall be undertaken in accordance with those details to be approved.
The results of this survey shall be provided in writing and drawn form to the Local Planning Authority and the written permission of the Local Planning Authority shall be obtained before demolition of these outbuildings commences.
The reason for the condition is :-
To protect the adjacent listed building. |
| 4. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
It is confirmed that this shadow HRA submitted by the applicant has been assessed as being suitable for the Borough Council as competent authority to use as the HRA record for the determination of the planning application, in accordance with the Conservation of Habitats and Species Regulations 2017.
In this instance the Borough Council has considered there is no likely significant effect on protected habitats arising solely from the development itself; and the development would contribute to the overall in-combination significant adverse effect identified by the Habitats Regulations Assessment Report for the Local Plan Core Strategy, but this effect can be adequately mitigated by the Habitats Monitoring and Mitigation Strategy; and that Strategy requires a payment of £110 per each additional dwelling towards the monitoring and mitigation provided through that Strategy. |