Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is:- Required to be imposed pursuant to Section 18 of the Planning (Listed Building and Conservation Areas) Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the revised plans (20031) 300 revision 03 elevations; 500 revision 00 window detail, received by the Local Planning Authority on 6 September 2021, and 200 revision 03 Ground and first floor plan; 201 revision 04 second and third floor plan, 202 revision 02 roof plan; received by the Local Planning Authority on 15 September 2021. The reason for the condition is :- For the avoidance of doubt.
3.There shall be no occupation of the dwelling within the ground floor of the development hereby permitted until the following details have first been submitted to and approved in writing by the Local Planning Authority: (a) Full details of the acoustic protection methods to be provided to the dwelling's glazing, with noise reduction properties specified therein; and, (b) Full details of the new ground floor bay and window installation, design and proposed ventilation. The work shall be constructed in accordance with the approved plans, which shall be provided and ready for use before occupation commences. The reason for the condition is :- To ensure amenity for future occupants with regard to the noisy urban environment whilst also designing for adequate ventilation.
4.All original external and internal historic features, part of the special character of the heritage asset (including roof materials, roof structure, rainwater goods where metal, brickwork, joinery of historic importance, etc) should be preserved and protected from any damage throughout the works. Any damaged fabric should be repaired in a like for like manner with relevant matching materials and techniques. The reason for the condition is:- To ensure that regard is paid to protecting the special architectural and historic interest and integrity of the building under Section 16 of the Planning (Listed Buildings and Conservation Areas) Act 1990
5.All the new external and internal repair works to the retained fabric shall match the existing adjacent historic work with regard to the methods, materials, colour, texture and profile, unless agreed otherwise with the Local Planning Authority. Newly added brickwork should match the quality of the existing and should be laid in lime mortar. Any repointing should also be carried out in matching lime mortar. The reason for the condition is:- To ensure that the used materials and finishes are appropriate for the character and appearance of the Listed building.
6.During the works, if hidden historic features or archaeology are revealed they should be retained in-situ. Works shall be halted in the relevant area of the building and the Local Planning Authority should be notified immediately. The reason for the condition is:- To ensure that historic features are recorded and preserved as part of the special character of the Listed Building.
7.Before work begins, the following details shall be submitted to and approved in writing by the Local Planning Authority: (a) Joinery details for the new rear windows showing enlarged part sections at a scale of not less than 1:2 the profiles in cross section. (b) Internal door details for any retained doors to be upgraded to fire doors and for new doors, showing enlarged part sections at a scale of not less than 1:2 the profiles in cross section. (c) Areas of repair of historic lath and plaster with a specification for the repair, and details of any new suspended ceilings introduced to provide noise and fire separation between the new flats. (c) Details of the existing flooring and for repair of this, or for upgrading to provide sound and fire protection between the flats. (d) Position, type and method of installation of all new services and related fixtures (including rainwater goods, communications and information technology servicing), which shall be specified and agreed with the Local Planning Authority if these installations are to be fixed at any part of the Listed Building and have not been previously included within the application documents. The development shall thereafter be constructed in full accordance with the details as approved. The reason for the condition is:- To ensure that the integrity of the Listed building is protected.
8.NOTES - Please read the following notes carefully:- It is the Applicant's responsibility to clarify the boundary with the public highway. Private structures such as fences, or walls will not be permitted on highway land. The highway boundary may not match the applicant's title plan. For further details please contact the highway research team at highway.boundaries@norfolk.gov.uk The applicant should check for any Anglian Water assets which cross or are within close proximity to the site. Any encroachment zones should be reflected in site layout. They can do this by accessing our infrastructure maps on Digdat. Please see our website for further information: https://www.anglianwater.co.uk/developers/development-services/locating-our-assets/ Please note that if diverting or crossing over any of our assets permission will be required. Please see our website for further information: https://www.anglianwater.co.uk/developers/drainage-services/building-over-or-near-our-assets/
9.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.