| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the following plan - 931/01 Rev A - received by the Local Planning Authority on 12th July 2021.
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | The existing dwelling (as indicated on the existing site plan within submitted plan 931/01 Rev A received by the Local Planning Authority on the 12th July 2021) shall be demolished and all associated materials removed from site prior to the commencement of any works on the replacement dwelling.
The reason for the condition is :-
To enable the Local Planning Authority to retain control over the development in the interests of the visual amenities of the locality. |
| 4. | No works shall commence on site, other than demolition and site clearance, until details of a surface water drainage system has been submitted to and approved in writing by the Local Planning Authority. Prior to the occupation of the dwelling, surface water management scheme shall be installed in accordance with the approved details.
The reason for the condition is:-
To ensure the adequate provision of surface water drainage and in the interests of ensuring no harm is caused to the integrity of the cliff. |
| 5. | No works shall commence on site, other than demolition and site clearance, until a biodiversity enhancement plan has been submitted to and approved in writing by the Local Planning Authority, detailing the enhancement measures for biodiversity on site. The measures shall be carried out strictly in accordance with the approved scheme.
The reason for the condition is :-
To ensure that the application complies with core policy CS11 of the Core Strategy. |
| 6. | The development shall be carried out in accordance with the approved details for external materials as on page 8 of the Design and Access Statement received by the Local Planning Authority on the 12th July 2021. For the avoidance of doubt these are:
Walls - Wienberger Olde Essex Red Multi Facing brickwork
Pitched Roof - Wienberger Double Pantiles in Dark Grey
Front Door - Composite
Rear doors - White uvpc
Windows - White uvpc
Eaves/bargeboards - Black uvpc
Rainwater goods - Black uvpc
No variation from the approved details shall take plan unless otherwise approved in writing by the Local Planning Authority.
The reason for the condition is: -
To ensure appropriate materials are used. |
| 7. | No occupation of the dwelling hereby permitted shall occur until the proposed on-site car parking area has been laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is: -
To ensure the permanent availability of the parking/manoeuvring areas, in the interests of satisfactory development and highway safety. |
| 8. | In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until:
1) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and
2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority.
The reason for the condition is :-
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 9. | Construction work shall not take place outside the following hours:-
08:00 to 18:00 Mondays
08:00 to 18:00 Tuesdays
08:00 to 18:00 Wednesdays
08:00 to 18:00 Thursdays
08:00 to 18:00 Fridays
08:30 to 13:30 Saturdays
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 10. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the aims of Core Policy CS09. |
| 11. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |
| 12. | NOTES - Please read the following notes carefully:-
The site will potentially generate a significant amount of dust during the conversion process; therefore, the following measures should be employed: -
- An adequate supply of water shall be available for suppressing dust;
- Mechanical cutting equipment with integral dust suppression should be used;
- There shall be no burning of any materials on site. |