| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the following plans and details received by the Local Planning Authority on 11 May 2021:
- Site location plan ref: ENV000382C-JBAB-DW-4_WP03-DR-PL-1105 revision P01;
- Ground floor plan 2015 - 10 revision C;
- First floor plan 2015 - 11 revision B;
- Elevations 2015 - 12 revision C;
- Elevations 2015 - 13; and,
- The flood mitigation proposal received by the Local Planning Authority on 25 August 2021.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | (a) The building the subject of this permission shall only be used for the purposes of a welfare building or welfare office and for activities which are related to and associated with port-related industrial purposes, and for no other purpose whatsoever without the express written permission of the Local Planning Authority.
(b) The development hereby permitted shall enure for the purposes of the applicant, ASCO Group, only.
The reason for the condition is :-
To ensure the building is used in accordance with the specific policies for the location, where retained policies EMP24 and 25 require port related uses, to ensure the facility does not lead to unrelated trips to the site when other more appropriate locations may be available, and to ensure that the use can be controlled and be able to managed carefully in relation to the safety of operations at the surrounding site. |
| 4. | The development hereby permitted shall not commence until an investigation and risk assessment has first been completed in accordance with a scheme to be first agreed in writing by the Local Planning Authority, to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The written report(s) shall include:
(i) a survey of the extent, scale and nature of contamination; (the phase 1 aspect has already been carried out so it is intrusive testing here required if indicated as required by that report)
(ii) an assessment of the potential risks to:
· human health,
· property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes,
· adjoining land,
· groundwaters and surface waters,
· ecological systems,
(iii) an appraisal of remedial options if required,
(iv) A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
The reason for the condition is: -
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
Note -
This must be conducted in accordance with the Environment Agency's 'Land contamination risk management (LCRM)'. |
| 5. | The development hereby permitted shall not commence until:
1) the approved contamination remediation scheme pursuant to condition 4 of this permission has been carried out in full, and,
2) a validation report that demonstrates the effectiveness of the remediation carried out has been submitted to and approved in writing by the Local Planning Authority.
The reason for the condition is: -
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 6. | In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until:
1) a report shall be submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and
2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority.
The reason for the condition is: -
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 7. | NOTES - Please read the following notes carefully:-
The applicant is strongly recommended to advise neighbouring businesses and residential occupiers of the proposals, including any periods of potentially significant disturbance e.g. demolition or piling, together with contact details in the event of problems.
Re contamination:
The responsibility for the safe development and secure occupancy of the site rests with the developer. The local planning authority has determined the application on the basis of the information available to it, but this does not mean that the land is free from contamination, or that the land could not be declared Contaminated Land in future.
Hours of Work:
Due to the close proximity of other residential dwellings and businesses, the hours of any construction or refurbishment works should be restricted to:
· 0730 hours to 1830 hours Monday to Friday
· 0830 hours to 1330 hours Saturdays
· No work on Sundays or Bank Holidays.
Local Air Quality:
The site will potentially generate a significant amount of dust during the construction process; therefore, the following measures should be employed:
· An adequate supply of water shall be available for suppressing dust;
· Mechanical cutting equipment with integral dust suppression should be used;
· There shall be no burning of any materials on site, or burial of asbestos, which should instead be removed by an EA licenced waste carrier, and the waste transfer notes retained as evidence. |
| 8. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |