1.The development shall be carried out in accordance with the plans NCC-1406A location plan BAU.4510-BN-0020 revision P01 site plan, BAU.4580-BN-0023 revision P01 floor plan and BAU.4580-BN-0021 and 22 both revision P01 elevations, received by the Local Planning Authority on 15th April 2021 and further revised plans NCC-1406D location plan showing red lined access off Suffolk Road and BAU.4580- BN C01 site plan received by the Local Planning Authority on 9th May 2021. The reason for the condition is :- For the avoidance of doubt.
2.This permission expires on 31st March 2024 and unless on or before this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority the use shall be discontinued. The site shall be cleared of all temporary buildings erected as part of this permission and other plant and materials shall be removed from the site at that time to the satisfaction of the Local Planning Authority The reason for the condition is:- In order to retain control over the use of the site until the effects of the proposal have been experienced and in the interest of the amenities of the locality.
3.Prior to the first occupation/use of the development hereby permitted the proposed access/on-site car and cycle parking/servicing/loading/unloading/turning/waiting area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. The reason for the condition is: - To ensure the permanent availability of the parking/manoeuvring areas, in the interests of satisfactory development and highway safety.
4.For the duration of the temporary use here permitted all traffic associated with the development will comply with the Great Yarmouth Third River Crossing West Side compound Construction Traffic Management Plan and use only the 'Construction Traffic Access Route' and no other local roads unless approved in writing with the Local Planning Authority. The reason for the condition is: - In the interests of maintaining highway efficiency and safety.
5.Construction work shall not take place outside the following hours:- 0730 hours to 1830 hours Monday to Friday 0830 hours to 1330 hours Saturdays No work on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property) The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
6.Local Air Quality: The site will potentially generate a significant amount of dust during the construction process; therefore, the following measures should be employed: · An adequate supply of water shall be available for suppressing dust; · Mechanical cutting equipment with integral dust suppression should be used; · There shall be no burning of any materials on site, or burial of asbestos, which should instead be removed by an EA licenced waste carrier, and the waste transfer notes retained as evidence. The reason for the condition is :-In the interests of the residential amenities of the occupiers of nearby dwellings
7.NOTES - Please read the following notes carefully:- Advisory Note The applicant is strongly recommended to advise neighbouring businesses and residential occupiers of the proposals, including any periods of potentially significant disturbance e.g. demolition or piling, together with contact details in the event of problems. Unexploded ordnance (UXO) There may have been a bomb strike on the National Grid portion of the land, albeit perhaps not within the area. The applicant should be vigilant during any construction works that may be permitted, and be prepared to call on expert UXO advice if needed. Disclaimer re contamination: The responsibility for the safe development and secure occupancy of the site rests with the developer. The local planning authority has determined the application on the basis of the information available to it, but this does not mean that the land is free from contamination, or that the land could not be declared Contaminated Land in future. Any waste skips placed on site should have provision for tethering, where predicted flood events are foreseen.
8.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.