| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the following revised plans (drawing refs: 150121-2A and 081220-3A) received by the Local Planning Authority on the 15th June 2021.
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | The existing dwelling (as indicated on plan 111220-1 received by the Local Planning Authority on the 26th April 2021) shall be demolished and all associated materials removed from site prior to the commencement of any works on the replacement dwelling.
The reason for the condition is :-
To enable the Local Planning Authority to retain control over the development in the interests of the visual amenities of the locality. |
| 4. | The driveway length in front of the garage shall be at least 6 metres as measured from the garage doors to the highway boundary.
The reason for the condition is: -
To ensure parked vehicles do not overhang the adjoining public highway, thereby adversely affecting highway users. |
| 5. | Prior to the first occupation of the development hereby permitted the proposed access, on-site car and cycle parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is: -
To ensure the permanent availability of the parking/manoeuvring areas, in the interests of satisfactory development and highway safety. |
| 6. | Prior to the first occupation of the dwellings, no fewer than 1 swift terrace box shall be installed on the northern gable. The bird box shall shall remain thereafter in perpetuity.
The reason for the condition is :-
To secure biodiversity enhancements in line with the NPPF. |
| 7. | In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until:
1) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and
2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority.
The reason for the condition is :-
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 8. | Construction work shall not take place outside the following hours:-
08:00 to 18:00 Mondays
08:00 to 18:00 Tuesdays
08:00 to 18:00 Wednesdays
08:00 to 18:00 Thursdays
08:00 to 18:00 Fridays
08:30 to 13:30 Saturdays
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 9. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposals meet the aims of CS09. |
| 10. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |
| 11. | NOTES - Please read the following notes carefully:-
The site will potentially generate a significant amount of dust during the conversion process; therefore, the following measures should be employed: -
- An adequate supply of water shall be available for suppressing dust;
- Mechanical cutting equipment with integral dust suppression should be used;
- There shall be no burning of any materials on site. |