| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the following revised plans (drawing ref: 19/180/01 Rev F) received by the Local Planning Authority on the 9th November 2020 and the Flood Response Plan received by the Local Planning Authority on the 13th October 2020.
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | Prior to the first occupation of the development hereby permitted the vehicular access shall be constructed in accordance with a detailed scheme to be agreed in writing with the Local Planning Authority in accordance with the highways specification TRAD 5 and thereafter retained at the position shown on the approved plan. Arrangement shall be made for surface water drainage to be intercepted and disposal of separately so that it does not discharge from or onto the highway.
The reason for the condition is: -
To ensure construction of a satisfactory access and to avoid carriage of extraneous material or surface water from or onto the highway in the interests of highway safety. |
| 4. | Notwithstanding the provision of the Town and Country Planning (General Permitted Development) Order (2015), (or any Order revoking, amending or re-enacting that Order) no gates/bollard/chain/other means of obstruction shall be erected across the approved access unless details have first been submitted to and approved in writing by the Local Planning Authority.
The reason for the condition is: -
In the interests of highway safety. |
| 5. | Prior to the first occupation/use of the development hereby permitted a 2 metre wide parallel visibility splay (as measured back from the near edge of the adjacent highway carriageway) shall be provided across the whole of the site's roadside frontage (and additionally along the flank frontage of the adjacent property as outlined in blue on the submitted details). The splay(s) shall thereafter be maintained at all times free from any obstruction exceeding 1.05 metres above the level of the adjacent highway carriageway.
The reason for the condition is: -
In the interests of highway safety in accordance with the principles of the NPPF. |
| 6. | Prior to the first occupation of the development hereby permitted the proposed access and car parking /turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is: -
To ensure the permanent availability of the parking/manoeuvring areas, in the interests of satisfactory development and highway safety. |
| 7. | Prior to the commencement of any works on the site, an Arboricultural Impact Assessment, including the details of any mitigation measures and the means of protection of the trees during the construction of the development, shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the recommendations included in the report.
The reason for the condition is :-
Because the details have not been agreed and in order to minimise the impact upon the trees subject to a Tree Preservation Order. |
| 8. | Construction work shall not take place outside the following hours:-
08:00 to 18:00 Mondays
08:00 to 18:00 Tuesdays
08:00 to 18:00 Wednesdays
08:00 to 18:00 Thursdays
08:00 to 18:00 Fridays
and no work shall take place on Saturdays, Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 9. | In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until:
1) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and
2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority.
The reason for the condition is :-
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 10. | No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of landscaping, which shall include indications of all existing trees and hedgerows on the land, and details of any to be retained, together with measures for their protection in the course of development.
All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the occupation of the buildings or the completion of the development, whichever, is the sooner, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 11. | The development shall be carried out in accordance with the mitigation measures and enhancements identified in the ecology report (Wildlife Frontier Ecology) received by the Local Planning Authority on the 18th August 2020.
The reason for the condition is :-
To secure biodiversity enhancements in line with the NPPF. |
| 12. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order) the dwelling shall not be extended in any way or outbuildings erected without the prior consent of the Local Planning Authority.
The reason for the condition is:-
To enable the Local Planning Authority to retain control over any extensions to the dwellings in the interests of residential amenity. |
| 13. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting the order) no windows shall be inserted into the walls or roof of the building(s), other than those approved as part of this application, without the prior consent of the Local Planning Authority.
The reason for the condition is:-
In the interests of the residential amenities of the occupiers of the adjacent property. |
| 14. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the aims of core policy CS09 from the adopted Core Strategy. |
| 15. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
It is confirmed that this shadow HRA submitted by the applicant has been assessed as being suitable for the Borough Council as competent authority to use as the HRA record for the determination of the planning application, in accordance with the Conservation of Habitats and Species Regulations 2017.
In this instance the Borough Council has considered there is no likely significant effect on protected habitats arising solely from the development itself; and the development would contribute to the overall in-combination significant adverse effect identified by the Habitats Regulations Assessment Report for the Local Plan Core Strategy, but this effect can be adequately mitigated by the Habitats Monitoring and Mitigation Strategy; and that Strategy requires a payment of £110 per each additional dwelling towards the monitoring and mitigation provided through that Strategy. |
| 16. | NOTES - Please read the following notes carefully:-
The site will potentially generate a significant amount of dust during the conversion process; therefore, the following measures should be employed: -
- An adequate supply of water shall be available for suppressing dust;
- Mechanical cutting equipment with integral dust suppression should be used;
- There shall be no burning of any materials on site. |
| 17. | NOTES - Please read the following notes carefully:-
Great Yarmouth Borough Council has a duty to ensure that roads and streets within the Borough are properly named and that the properties fronting onto them are appropriately numbered. Therefore it is essential that once planning permission has been granted, and prior to the completion of development, the developer/owner applies for an official address. This Authority has adopted the legislation set out in sections 17, 18 and 19 of The Public Health Act 1925. In common with most neighbouring local authorities, Great Yarmouth Borough Council is introducing charging for the street naming and numbering of new developments from the 1st January 2020. Charges and more information can be seen on the Council's website here: https://www.great-yarmouth.gov.uk/street-naming-numbering |
| 18. | It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority This development involves work to the public highway that can only be undertaken by the County Council within the scope of a legal Agreement with the applicant. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary Agreements under the Highways Act 1980 are also obtained. Advice on this matter can be obtained from the County Council's Highways Development Control Group based at County Hall in Norwich. Please contact (insert appropriate highways development control case officer contact details).