| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the application forms and following plans (drawing ref: AD01-P-01 001 A1, AD01-P-01 002 A1 and AD01-S-02 001 A1) received by the Local Planning Authority on the 17th August 2020.
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | No development shall take place until an archaeological written scheme of investigation has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and 1) The programme and methodology of site investigation and recording, 2) The programme for post investigation assessment, 3) Provision to be made for analysis of the site investigation and recording, 4) Provision to be made for publication and dissemination of the analysis and records of the site investigation, 5) Provision to be made for archive deposition of the analysis and records of the site investigation and 6) Nomination of a competent person or persons/organization to undertake the works set out within the written scheme of investigation.
Reason for condition: -
In accordance with National Planning Policy Framework 2019 paragraphs 199 and 189. |
| 4. | No development shall take place other than in accordance with the written scheme of investigation approved under condition 3.
Reason for condition: -
In accordance with National Planning Policy Framework 2019 paragraphs 199 and 189. |
| 5. | The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the archaeological written scheme of investigation approved under condition 3 and the provision to be made for analysis, publication and dissemination of results and archive deposition has been secured.
Reason for condition: -
In accordance with National Planning Policy Framework 2019 paragraphs 199 and 189. |
| 6. | Prior to the first occupation of the development hereby permitted the vehicular access shall be constructed in accordance with the highways specification (TRAD 1, attached) and thereafter retained at the position shown on the approved plan. Arrangement shall be made for surface water drainage to be intercepted and disposal of separately so that it does not discharge from or onto the highway.
The reason for the condition is: -
To ensure construction of a satisfactory access and to avoid carriage of extraneous material or surface water from or onto the highway in the interests of highway safety. |
| 7. | No part of the proposed structure (to include fascia board/rainwater guttering) shall overhang or encroach upon highway land and no gate/door/ground floor window shall open outwards over the highway.
The reason for the condition is: -
In the interests of highway safety. |
| 8. | Prior to the first occupation of the development hereby permitted a 2 metre wide parallel visibility splay (as measured back from the near edge of the adjacent highway carriageway) shall be provided across the whole of the site's roadside frontage. The splay(s) shall thereafter be maintained at all times free from any obstruction exceeding 1.0 metre above the level of the adjacent highway carriageway.
The reason for the condition is: -
In the interests of highway safety in accordance with the principles of the NPPF. |
| 9. | Prior to the first occupation of the development hereby permitted the proposed access, on-site car parking/turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is: -
To ensure the permanent availability of the parking/manoeuvring areas, in the interests of satisfactory development and highway safety. |
| 10. | Prior to the first occupation of the development hereby approved, a landscaping scheme including the details of no less than 2no. trees shall be submitted to and approved by the Local Planning Authority. Details shall include location, size and species of the trees to be planted. The trees shall be planted in accordance with the approved details prior to occupation. If either tree becomes diseased or dies within five years of occupation of the development it shall be replaced at the following planting season, between October and April the following year, by a tree of the same species and the same or larger in size.
The reason for the condition is:-
The existing trees represent an important visual amenity which the Local Planning Authority consider should be substantially maintained. |
| 11. | Prior to any works above slab level, the details of no less than 3 bird boxes shall be submitted and agreed with in writing by the Local Planning Authority. These bird boxes shall be installed prior to the first occupation of the dwelling and shall remain thereafter in perpetuity.
The reason for the condition is :-
To secure biodiversity enhancements inline with the NPPF. |
| 12. | Construction work shall not take place outside the following hours:-
08:00 to 18:00 Mondays
08:00 to 18:00 Tuesdays
08:00 to 18:00 Wednesdays
08:00 to 18:00 Thursdays
08:00 to 18:00 Fridays
08:30 to 13:30 Saturdays
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 13. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria of saved policy HOU07 and HOU17 from the Borough-Wide Local Plan |
| 14. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
It is confirmed that this shadow HRA submitted by the applicant has been assessed as being suitable for the Borough Council as competent authority to use as the HRA record for the determination of the planning application, in accordance with the Conservation of Habitats and Species Regulations 2017.
In this instance the Borough Council has considered there is no likely significant effect on protected habitats arising solely from the development itself; and the development would contribute to the overall in-combination significant adverse effect identified by the Habitats Regulations Assessment Report for the Local Plan Core Strategy, but this effect can be adequately mitigated by the Habitats Monitoring and Mitigation Strategy; and that Strategy requires a payment of £110 per each additional dwelling towards the monitoring and mitigation provided through that Strategy. |
| 15. | NOTES - Please read the following notes carefully:-
Great Yarmouth Borough Council has a duty to ensure that roads and streets within the Borough are properly named and that the properties fronting onto them are appropriately numbered. Therefore it is essential that once planning permission has been granted, and prior to the completion of development, the developer/owner applies for an official address. This Authority has adopted the legislation set out in sections 17, 18 and 19 of The Public Health Act 1925. In common with most neighbouring local authorities, Great Yarmouth Borough Council is introducing charging for the street naming and numbering of new developments from the 1st January 2020. Charges and more information can be seen on the Council's website here: https://www.great-yarmouth.gov.uk/street-naming-numbering |
| 16. | NOTES - Please read the following notes carefully:-
The applicant is reminded that, under the Wildlife and Countryside Act 1981, as amended (section 1), it is an offence to remove, damage or destroy the nest of any wild bird while the nest is in use or being built. Planning consent for a development does not provide a defense against prosecution under this act. While trees and scrub are likely to contain nesting birds between 1st March and 31st August inclusive buildings can also support nesting birds. If works occur during the nesting period a careful check of the building by a competent ecologist should be undertaken to assess the nesting bird activity on the site during this period and has shown it is absolutely certain that nesting birds are not present. |
| 17. | NOTES - Please read the following notes carefully:-
Occasionally European protected species, such as bats, can be found during the course of the development. In the event that this occurs, it is advised that the developer stops work immediately and seeks the advice of a suitably qualified ecological consultant. |
| 18. | This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing.
It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Design and Development Group. Please contact Stuart French on 01603 638070.
If required, street furniture will need to be repositioned at the applicant's expense.
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. |