No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall be carried out in accordance with the submitted application form and drawing reference: LEATH SP ( Site plan as existing and proposed) received on 9 July 2020 and revised drawing reference: LEATH PLAN Rev 02 received on 9 September 2020 by the Local Planning Authority and shall be retained in the approved form thereafter. No material variation from these plans shall take place unless otherwise first agreed in writing with the Local Planning Authority. The reason for the condition is :- In order that the development hereby permitted shall be fully implemented in complete accordance with the approved plans and to accord with the Great Yarmouth Borough-Wide Local Plan.
3.The proposed internal layout of the development (granny annexe) hereby permitted shall be in accordance with approved drawing reference: LEATHWAY PLAN Rev 02. No variation from the approved layout shall take place unless otherwise first agreed in writing with the Local Planning Authority The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings and character.
4.The materials to be used in the construction of the external surfaces of the development shall be in accordance with the application form on 9 September 2020 by The Local Planning Authority and shall be retained in the approved form thereafter. No material variation from these plan shall take place unless otherwise first agreed in writing with the Local Planning Authority. The reason for the condition is :- In order that the development hereby permitted shall be fully implemented in complete accordance with the approved plans and to accord with the Great Yarmouth Borough-Wide Local Plan
5.The additional accommodation hereby permitted shall only be used by the occupiers of the adjoining dwelling, or their dependants, and shall not be used as a separate dwelling or let separately for holiday purposes. The reason for the condition is :- This permission is granted under exceptional circumstances for a form of development not normally permitted by the Local Planning Authority and to enable the Authority to retain control over the use of the site.
6.Prior to the construction of the development hereby permitted, the existing detached garage shall be demolished and measures to prevent the deposit of debris on the public highway, adjoining properties shall be implemented. The developer must ensure that objects cannot fall outside the site boundary and any materials arising from the demolition works shall be securely stored in a safe location. There shall be no burning of any materials on site. The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
7.No deliveries shall take place during the construction period outside the following hours:- 08:30 to 18:00 Monday to Friday. 09:00 to 13:00 Saturday. No deliveries shall take place on Sundays or Bank Holidays. The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
8.Construction work shall not take place outside the following hours:- 08:00 to 18:00 Monday to Friday, 08:30 to 13:30 Saturday No work shall take place on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property). The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
9.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria for domestic additions set out in saved Policy HOU18 of the Great Yarmouth Borough-Wide Local Plan.
10.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
11.NOTES - Please read the following notes carefully:- The site will potentially generate a significant amount of dust during the demolition process therefore, the following measures should be employed. 1. An adequate supply of water shall be available for suppressing dust. 2. Mechanical cutting equipment with integral dust suppression should be used.