Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is:- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the plans: site plan JA189 received 01 3/6/20 and coach house plan 30 revision C and coach house elevations 50 revision C received by the Local Planning Authority on 1/5/20 and JA-189 10 D received 9/12/20 The reason for the condition is :- For the avoidance of doubt.
3.All the new external and internal works of making good to the retained fabric shall match the existing adjacent historic work with regard to the methods of construction, materials, colour, texture, size and profile. Reason: To ensure that the used materials and finishes are appropriate for the character and appearance of the Listed and Curtilage buildings.
4.All historic features (including roof structure and slate, masonry, joinery, etc) should be preserved and protected from any further damage, including damage that might arise from the works. Any damaged fabric should be repaired in a like for like manner with relevant matching materials and techniques. Reason: To ensure that special regard is paid to protecting the special architectural and historic interest and integrity of the building under Section 16 of the Planning (Listed Buildings and Conservation Areas) Act 1990
5.Before work begins on any specific element, the position, type and method of installation of all new and relocated services and related fixtures (including rainwater goods, communications and information technology servicing), shall be specified and agreed in writing with the Local Planning Authority. These details shall include for where installations are to be visible, or where placed in ducts or where other methods of concealment are proposed. The works shall be implemented only in accordance with such approval. Reason: To ensure that the integrity of the Listed building and curtilage structures is protected.
6.Before work commences on the new screens to the coach house it shall be further confirmed in written and drawn details how these relate to the existing structural openings and further details of joinery shall be provided at a scale of not less than 1:2 in scrap section to show the joinery profile. The work shall be effected in accordance with the approved details. The reason for the condition is :- To protect the character and setting of the listed building group.