No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall be carried out in accordance with the Design and Access Statement and planning application forms received on 30 April 2020, drawing no.1157/7 site plan and survey, 1157/9 garage layouts and amended drawing 1157/8A for Units 3 and 4 plans and elevations received 8 September 2020 The reason for the condition is :- For the avoidance of doubt.
3.No work shall commence on the buildings marked 7 and 8 of figure 3, page 20 of the Protected Species Survey prepared by Wild Frontier Ecology until emergence and dawn surveys for bats have been carried out in accordance with recommendation 5.1 of that report and submitted to the Local Planning Authority. If bat roosts are found then full mitigation measures shall be submitted to and approved by the Local Planning Authority before any work takes place. The reason for the condition is :- The Protected Species Survey submitted with the application has identified the buildings as having roosting potential for bats.
4.The dwellings hereby permitted shall not be occupied until the vehicular access has been upgraded/widened to a minimum width of 4.5m in accordance with the Norfolk County Council industrial access construction specification for the first 10metres as measured back from the near channel edge of the adjacent carriageway. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. The reason for the condition is :- In the interest of highway safety and traffic movement.
5.The dwellings hereby permitted shall not be occupied until a visibility splay measuring 2.4 X 215 metres has been provided to each side of the access where it meets the highway and such splays shall thereafter be maintained free from any obstruction exceeding 1.05 metres above the level of the adjacent highway carriageway. The reason for the condition is :- In the interests of highway safety.
6.The dwellings hereby permitted shall not be occupied until the garages and parking/turning areas for each dwelling have been provided. The parking/turning areas shall be levelled, surfaced and drained in accordance with a detailed scheme submitted to and approved in writing by the Local Planning Authority, in consultation with the Highway Authority, and thereafter kept available for that specific use. The reason for the condition is :- In the interests of satisfactory development and highway safety.
7.Prior to the commencement of the development a detailed schedule of all external materials and other finishes to be used in the development shall be submitted for agreement in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. The reason for the condition is :- To enable the Local Planning Authority to retain control over the development to ensure that such items are in keeping with and appropriate to a residential barn conversion.
8.Prior to the commencement of work, details of the construction, materials and finishes of all doors and windows and details including finishes, of all soil and vent pipes, waste pipes, rainwater goods and meter boxes (notwithstanding the description shown on approved drawings) shall be submitted for agreement in writing by the local Planning Authority. The development shall be carried out in accordance with the approved details. The reason for the condition is :- To enable the Local Planning Authority to retain control over the development to ensure that such items are in keeping and appropriate to a residential barn conversion.
9.No painting of the external surfaces of the dwellings hereby permitted, nor any repointing of brickwork shall take place without the prior consent of the Local Planning Authority. Proposals shall be submitted to and approved by the Local Planning Authority before the work is begun and the work shall be carried out in accordance with the approved details. The reason for the condition is :- To ensure that such work does not detract from the appearance and character of the buildings.
10.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no enlargement of the dwellings hereby permitted shall take place, nor shall any doors, windows or other openings (other than those expressly authorised by this permission) be inserted in the buildings without the prior consent of the Local Planning Authority. The reason for the condition is :- To preserve the appearance and character of the existing buildings and protect the residential amenities of the occupiers of adjacent property.
11.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no buildings or enclosures, swimming or other pools required for a purpose incidental to the enjoyment of the dwellings hereby permitted shall be provided without the prior consent of the Local Planning Authority. The reason for the condition is :- To enable the Local Planning Authority to retain control over the development in the interests of the visual amenities of the locality and the landscape character.
12.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no gates walls or other means of enclosure (other than those expressly authorised by this permission) shall be erected without the prior consent of the Local Planning Authority. The reason for the condition is:- To enable the Local Planning Authority to retain control over the development in order to ensure such items do not detract from the appearance of the countryside.
13.The garages hereby permitted shall only be used for the parking of vehicles and shall not be altered in any way without the prior consent of the Local Planning Authority. The reason for the condition is :- To ensure the permanent availability of adequate on-site parking facilities.
14.Biodiversity Method Statement No development shall take place (including any demolition, ground works or site clearance) until a biodiversity method statement has been submitted to and approved in writing by the LPA. The content of the method statement will include recommendations for bird and bat boxes and habitat creation onsite. · Purpose and objectives for the proposed works, · Detailed designs and/or working methods necessary to achieve the stated objectives · Extent and location of proposed works shown on appropriate scale maps and plans, · Details for the creation of new wildlife features · Details for the provision of native tree and shrubs · Timetable for implementation, demonstrating that works are aligned to the proposed phasing of construction, · Persons responsible for implementation of the works, · Initial aftercare and long-term maintenance (where relevant); · Disposal of any wastes arising from works. Site lighting schemes for the new development should be unobtrusive, hooded/shielded and directional away from features that may be used by roosting, commuting and foraging bats, such as hedgerows and trees. The Bat Conservation Trust and The Institution of Lighting Professionals (ILP) have produced guidance on bats and lighting: https://www.theilp.org.uk/documents/guidance-note-8-bats-and-artificial-lighting/ The works shall be carried out strictly in accordance with the approved details and shall be retained in that manner thereafter." Note: This statement should include provision for hedgehog gaps and bee bricks The reason for the condition is :- To provide alternative nesting sites for bats/owls.
15.Submission of a copy of the EPS licence The development shall not in any circumstances commence unless the local planning authority has been provided with a copy of the licence issued by Natural England pursuant to Regulation 53 of the Conservation of Habitat and Species Regulations 2010 authorizing the specified activity/development to go ahead. The reason for the condition is :- To ensure compliance with legislation.
16.Contaminated Land: The recommendations of the report for Remediation Strategy commissioned by Norfolk Partnership Laboratory should be followed, to ensure the site is free of contamination. The recommendations are as follows: Demolition of the concrete barn with cement board roofing. The cement board potential containing asbestos containing material (ACM) should be removed by a suitably licensed contractor and disposed of to a suitably licensed facility. All conveyance notes should be submitted in a validation report. Following the removal of the building the site should be inspected by a competent person from NPL to confirm that no ACM is still present. Supervision of site during the initial renovation stage. It is proposed that a representative of NPL will visit the site regularly during the initial renovation stage to inspect the strata beneath any floors exposed. The client or his contractor employed to work within the site will also be instructed to cease work and contact NPL if any suspicious ground or material is encountered. If any suspicious material is found it will be isolated and investigated using analysis for relevant contaminants of concern. Remediation of garden areas. Following the renovation of the buildings all garden areas will be stripped of any Made Ground to reveal the clean subsoil before being dressed with a minimum of 300mm of certified Topsoil. The Topsoil will be sourced from the certified stockpile present on the site. Inspection and validation confirming that the correct thicknesses constructed will be required. This information will be collected and collated throughout the construction process and submitted in a final validation report. Remediation of driveways and hard-standings. Following the renovation of the buildings all driveways, parking areas and courtyard areas will again be excavated to a depth ensuring all the Made Ground has been removed before being reconstructed with a minim of 300mm of construction material. The material discussed in Section 5.3 can be re used in these areas of the site. Inspection and validation confirming that the requirements have been carried out will be required. This information will be collected and collated throughout the construction process and submitted in a final validation report. Validation A validation report showing evidence that the remediation strategy detailed in this report has been carried out will be produced as the works are undertaken. This information will be supplied to Great Yarmouth Borough Council for acceptance. The reason for the condition is :- To establish whether the land is contaminated and to secure any measures necessary to protect the future occupiers of the development.
17.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the requirements of Policies HOU11, HOU15, BNV21 and NNV5 of the adopted Great Yarmouth Borough-Wide Local Plan.
18.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.
19.NOTES - Please read the following notes carefully:- a) This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Management Group. Please contact Stuart French on 0344 800 8020. If required, street furniture will need to be repositioned at the applicant's expense. Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. b) The applicants' attention is drawn to the attached letter from the Environment Agency and the need to comply fully with their requirements. c) Protected Species The applicants are reminded of their responsibility under the Wildlife and Countryside Act 1981 to ensure that protected species are not disturbed or put at risk by the development hereby permitted and the need to obtain a European Protected Species mitigation licence as advised in paragraph 5.5 of the submitted Protected Species Survey. Hours of Work: Due to the close proximity of other residential dwellings, the hours of development should be restricted to:- · 0730 hours to 1800 hours Monday to Friday · 0800 hours to 1300 hours Saturdays · No work on Sundays or Bank Holidays. Local Air Quality: The site will potentially generate a significant amount of dust during the construction process; therefore, the following measures should be employed:- · An adequate supply of water shall be available for suppressing dust; · Mechanical cutting equipment with integral dust suppression should be used; · There shall be no burning of any materials on site.