| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of the original permission reference 06/18/0581/LB.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the revised plans reference: revised elevation 6846-P02 M and revised plan 6846-AS01 H dated 27/7/20 and received by the Local Planning Authority on 28/7/20 and drawings 6846-DT01 (ATM infilling), 6846-DT02 window details sheet 1 and 6846-DT03 window details sheet 2, "lift out" by Glass and Glazing Company product data sheet and 6846-P03 G (Amended roof plan)
The reason for the condition is :- For the avoidance of doubt. |
| 3. | Note that no alterations or works, other than those expressly approved within this permission shall be carried out to the western Hall Quay elevation of the building. |
| 4. | Any noisy construction and refurbishment work shall not take place outside the following hours:
07:30 to 18:30 Monday to Friday
08:30 to 13:30 Saturday, Sundays or Bank Holidays.
The reason for the condition is : In the interests of the residential amenities of the occupiers of nearby dwellings but with flexibility permitted in relation to coronavirus impacts. |
| 5. | No part of the proposed structure (to include facia board/rainwater guttering), shall overhang or encroach upon highway land and no gate/door/ground floor window shall open outwards over the highway.
The reason for the condition is : In the interest of highway safety. |
| 6. | Any mortar used in the making good of masonry in the western part of the building, the three storey part, shall use lime mortar without cement, either hydraulic or lime putty, with a sand or other bulking element such as ground chalk aggregate, chosen to provide a match to the material used originally in the construction. Pointing shall be struck so as to match the original construction
The reason for the condition is :- To ensure all making good is carried out in a seamless manner given the listed status of the heritage asset. |