Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the application forms and plans (drawing no. 976/1) received by the Local Planning Authority on the 17th February 2020. The reason for the condition is:- For the avoidance of doubt.
3.Prior to the first occupation of the development hereby permitted the vehicular access shall be constructed in accordance with the Norfolk County Council residential access construction specification (TRAD 5 attached) for the first 2.5 metres as measured back from the near channel edge of the adjacent carriageway. Arrangement shall be made for surface water drainage to be intercepted and disposal of separately so that it does not discharge from or onto the highway. The reason for the condition is :- To ensure construction of a satisfactory access and to avoid carriage of extraneous material or surface water from or onto the highway in the interests of highway safety and traffic movement.
4.Prior to the first use of the development hereby permitted, visibility splays shall be provided in full accordance with the details indicated on the approved plan. The splays(s) shall thereafter be maintained at all times free from any obstruction exceeding 0.225 metres above the level of the adjacent highway carriageway. The reason for the condition is: - In the interests of highway safety and in accordance with the principles of the NPPF.
5.The out buildings (as indicated on the site plan received by the Local Planning Authority on the 17th February 2020) shall be demolished and all associated materials removed from site prior to the commencement of any works on the replacement dwelling. The reason for the condition is :- To enable the Local Planning Authority to retain control over the development in the interests of the visual amenities of the locality.
6.Prior to the first occupation of the development hereby permitted the static caravan (as indicated on drawing no. 976/1 received by the Local Planning Authority on the 17th February 2020) shall be permanently removed from the site. The reason for the condition is :- To enable the Local Planning Authority to retain control over the development in the interests of the visual amenities of the locality.
7.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking and re-enacting that order) the dwelling shall not be further extended in any way without the prior consent of the Local Planning Authority. The reason for the condition is:- To enable the Local Planning Authority to retain control over any further extensions to the dwelling in the interests of residential amenity.
8.REASON FOR APPROVAL OF THE APPLICATION :- The proposal broadly meets the criteria of saved policy HOU20 from the Borough-Wide Local Plan.
9.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.