| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development hereby permitted shall be carried out in accordance with the submitted application form and drawing number: 3030.01 Rev A 12/19 Access received on 17 December 2019 by the Local Planning Authority and shall be retained in the approved form thereafter. No material variation from these plans shall take place unless otherwise first agreed in writing with the Local Planning Authority.
The reason for the condition is :-
In order that the development hereby permitted shall be fully implemented in complete accordance with the approved plans and to accord with the Great Yarmouth Borough-Wide Local Plan. |
| 3. | Prior to the first use of the development hereby permitted the vehicular access/crossing shall be constructed in accordance with the detailed scheme to be agreed in writing with the Local Planning Authority and thereafter retained at the position shown on the approved plan. Arrangement shall be made for the surface water drainage to be intercepted and disposal of separately so that it does not discharge from or onto the highway.
The reason for the condition is :-
To ensure construction of a satisfactory access and to avoid carriage of extraneous material or surface water from or onto the highway in the interest of highway safety. |
| 4. | Any access gates/bollard/chain/other means of obstruction shall be hung to open inwards, set back and thereafter retained a minimum distance of 5 metres from the near channel edge of the adjacent carriageway. Any sidewalls/fences/hedges adjacent to the access shall be splayed at an angle of 45 degrees from each of the outside gateposts to the front boundary of the site.
The reason for the condition is :-
In the interest of highway safety enabling vehicles to safely draw off the highway before the gates/obstruction is opened. |
| 5. | Vehicular access to and egress from the adjoining highway shall be limited to the access shown on Drawing No.3030.01 Rev A only. Any other access or egress shall be permanently closed and there shall be no direct or indirect vehicular access to the adjacent hatchery/hatchery car park.
The reason for the condition is :-
In the interests of highway safety. |
| 6. | Prior to the first use of the development hereby permitted visibility splays measuring 2.4 metres x 70 metres shall be provided to each side of the access where it meets the highway. The splays shall thereafter be maintained at all times free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway.
The reason for the condition is :-
In the interest of highway safety in accordance with the principles of the NPPF. |
| 7. | Prior to the first occupation/use of the development hereby permitted the proposed access, on-site car parking and turning area shall be laid out, demarcated, levelled,surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking/manoeuvring areas, in the interest of satisfactory development and highway safety. |
| 8. | Construction work shall not take place outside the following hours:-
07:30 to 18:00 Monday to Friday
08:30 to 13:30 Saturdays
No work on Sunday or Bank Holidays.
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 9. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the requirements of Policy CS16 of the adopted Core Strategy (2015) (CS) and Section 73A of the Town and Country Planning Act 1990. |
| 10. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |
| 11. | NOTES - Please read the following notes carefully:-
This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing.
It is an OFFENCE to carry out any works within the Public Highway ,which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the Applicant's responsibility to ensure that in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained form the County Council. Advice on this matter can be obtained from the County Council's Highway Design and Development Management Group. Please contact Stuart French on 01603 638070.
If required,street furniture will need to be repositioned at the Applicant's own expense.
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. |