No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the revised plan received by the Local Planning Authority as follows: · Ingleton Wood General Arrangement drawing: Hopton IWD-XX-XX-DR-A-2000.1 revision p14 received 23.7.20 and · house design drawings: o 2502 to 2504 inclusive all revision P2 and 2506 to 2518 inclusive all revision P2, all received 15.1.20 o 2505 revision P3, 2519 to 2527 inclusive all revision P3 and 2531 revision P1, all received 17.4.20 · garage drawings 2528 to 2530 inclusive all revision P1 received 15.1.20 and · landscape drawings JBA19-113-01 to 11 inclusive, all revision F received 23.7.20. and · drainage drawings RLC-00-00-DR C-001 revision P4, RLC-00-00-DR C002 revision P4, Section 104 General arrangement: C-030 revision P3 all received 22.7.20 (note we actually submitted 8.7.20) The reason for the condition is :- For the avoidance of doubt.
3.Plots 71-77 shall not be occupied until the provision of ducting with "pull throughs", sufficient to allow the future potential of one electric vehicle charging point per dwelling, has been installed in the parking court serving those plots. The layout of the ducting shall be submitted in drawn form to and agreed by the local planning authority before installation and then installed to the agreed form. A form of temporary capping of the ducts shall also be agreed at the time of the layout submission. The reason for the condition is :- To make passive provision for future electric vehicle ownership.
4.Before occupation of any dwelling the routes of the woodland walks shown in indicative form on the submitted site plans shall be further agreed by submission in written and drawn form to the local planning authority and the subsequent agreement by the LPA of the proposal. These plans shall including details of trees to be removed to facilitate the paths. The work shall proceed in accordance with the submitted plans. The reason for the condition is :- To ensure circular walks are available assisting in reducing impact from recreational activities on wildlife sites.
5.Before construction proceeds beyond damp proof course level on the plots identified as at risk from excessive noise, further details shall be submitted in written drawn and calculated form to demonstrate the means by which the plots shown at risk from night time noise levels in excess of the WHO standards of noise are to be enhanced by means of imporved fabric performance and the means by which ventilation and passive cooling will be achieved to enable windows to be kept shut without overheating in summer or lack of ventilation at all times. The local planning authority shall approve such proposals before works proceed beyond damp proof course, and the work shall be carried out in accordance with the approved scheme. The reason for the condition is :- Some of the site close to the A47 is regarded as a high noise environment, where fabric enhancement can address excess noise.
6.Before occupation of any part of the development further details of the means by which access shall be restricted to the sustainable drainage water body and the signage to be displayed shall be submitted in writing and approved by the local planning authority in written form. In addition a risk assessment in regard to risks associated with the sustainable drainage waterbody shall be prepared and scrutinised by a suitably qualified third party independent risk assessor at the developers expense and the findings recorded and lodged with the local planning authority . The reason for the condition is :- To ensure public safety in and around the waterbody and vest the risk other than with the public purse.
7.The planting scheme shall be implemented to the timetable and maintenance programme to accord with the Green Infrastructure Management Plan received 17th April 2020 with reference to drawing BA 19/113 Rev A The reason for the condition is :- To ensure the ongoing maintenance of green infrastructure.
8.Prior to the completion of any building shell, the developer shall provide written details of the means by which the enhanced water consumption management in line with emergent policy E7 (for 110 litres per person per day) shall be secured, to the Local Planning Authority and those details subsequently be agreed.. The scheme shall be installed to accord to the agreed form at such time in the construction process as is dictated by the nature of the agreement. The reason for the condition is :- The new policy is now accorded considerable weight, and required reduction in per capita consumption beyond that in national building regulatory requirements. The timing of installation is phrased so as to allow construction to proceed as far as is possible before installing the features, but not to a point where installation would be rendered difficult.
9.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order) no roof windows, dormers or roof-lights shall be constructed on any rear facing roof of the development without the prior consent of the Local Planning Authority. The reason for the condition is:- To enable the Local Planning Authority to retain control over roof windows in the interests of residential amenity.
10.Before construction proceeds beyond the casting of foundations, further details of the materials to be used in the construction of wall surfaces and roofing shall be submitted in written and drawn form to the local planning authority and agreed in writing by the authority and the works shall then by in compliance with the scheduled materials. The reason for the condition is :- While a material schedule was submitted it refers to generic materials.
11.Before construction of the substation is undertaken further details of the substation itself, the precise location and the materials and dimensions for the boundary wall and gates and any pathway or alterations to the approved scheme of planting and landscape around the substation in the public area, shall be submitted in written and drawn form and approved by the Local Planning Authority before construction proceeds. The work shall be effected in the agreed form. The reason for the condition is :- Details for the substation are not yet fully established and require therefore further agreement