| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the revised plan, reference 1949-001 A, received by the Local Planning Authority on the 8th October 2019.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | The windows at the east elevation, annotated on the approved plan reference 1949-001 A as 'bathroom' shall be obscure glazed prior to occupation and the obscure glaze shall remain in perpetuity.
The reason for the condition is :-
To reduce the impact on the nearby properties by way of overlooking. |
| 4. | Construction work shall not take place outside the following hours:-
07:30 to 18:00 Monday to Friday
08:00 to 13:00 Saturday
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 5. | Prior to the commencement of the development and to the satisfaction of the Environmental Services Manager, a Phase 1 contamination report shall be carried out to assess whether the land is likely to be contaminated. The report shall also include details of known previous uses and possible contamination arising from those uses. If contamination is suspected to exist, a Phase 2 site investigation is to be carried out to the satisfaction of the Environmental Services Manager. If the Phase 2 site investigation determines that the ground contains contaminants at unacceptable levels then the applicant is to submit a written strategy detailing how the site is to be remediated to a standard suitable for its proposed end-use to the Environmental Services Manager. No buildings hereby permitted shall be occupied until the remediation works agreed within the scheme have been carried out to the satisfaction of the Local Planning Authority.
The reason for the condition is :-
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 6. | In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until:
1) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and
2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority.
The reason for the condition is :-
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 7. | Prior to the first occupation/use of the development hereby permitted the vehicular/pedestrian/cyclist access/crossing over the verge/ditch/ watercourse/footway shall be constructed in accordance with a detailed scheme to be agreed in writing with the Local Planning Authority in accordance with the highways specification (TRAD 1) and thereafter retained at the position shown on the approved plan. Arrangement shall be made for surface water drainage to be intercepted and disposal of separately so that it does not discharge from or onto the highway.
The reason for the condition is :-
To ensure construction of a satisfactory access and to avoid carriage of extraneous material or surface water from or onto the highway in the interests of highway safety. |
| 8. | Notwithstanding the provision of the Town and Country Planning (General Permitted Development) Order (2015), (or any Order revoking, amending or re-enacting that Order) no gates/bollard/chain/other means of obstruction shall be erected across the approved access unless details have first been submitted to and approved in writing by the Local Planning Authority.
The reason for the condition is :-
In the interests of highway safety. |
| 9. | Prior to the first occupation/use of the development hereby permitted a 2.4 metre wide parallel visibility splay (as measured back from the near edge of the adjacent highway carriageway) shall be provided across the whole of the sites roadside frontage. The splay shall thereafter be maintained at all times free from any obstruction exceeding 0.6metres above the level of the adjacent highway carriageway.
The reason for the condition is :-
In the interests of highway safety in accordance with the principles of the NPPF. |
| 10. | Prior to the first occupation/use of the development hereby permitted the proposed access/on-site car and cycle parking/servicing/loading/ unloading/turning/waiting area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking/ manoeuvring areas, in the interests of satisfactory development and highway safety. |
| 11. | Prior to the demolition of the retail unit an asbestos survey must be carried out, submitted to and approved by the Local Planning Authority. If asbestos is found removal must be carried out by suitable contactor.
The reason for the condition is :-
To ensure asbestos is adequately dealt with. |
| 12. | This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing.
It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Design and Development Group. Please contact Stuart French on 01603 638070.
If required, street furniture will need to be repositioned at the applicant's expense.
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. |
| 13. | NOTES - Please read the following notes carefully:-
An adequate supply of water should be available at all times for dust suppression. |
| 14. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
It is confirmed that this shadow HRA submitted by the applicant has been assessed as being suitable for the Borough Council as competent authority to use as the HRA record for the determination of the planning application, in accordance with the Conservation of Habitats and Species Regulations 2017.
In this instance the Borough Council has considered there is no likely significant effect on protected habitats arising solely from the development itself; and the development would contribute to the overall in-combination significant adverse effect identified by the Habitats Regulations Assessment Report for the Local Plan Core Strategy, but this effect can be adequately mitigated by the Habitats Monitoring and Mitigation Strategy; and that Strategy requires a payment of £110 per each additional dwelling towards the monitoring and mitigation provided through that Strategy. |
| 15. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria set out in Policy CS2 of the Great Yarmouth Core Strategy. |