| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out entirely in accordance with the details shown on the application forms and drawing no. 1426/01 received by the Local Planning Authority on 16th August 2019.
The reason for the condition is:-
For the avoidance of doubt and to ensure the development is carried out in accordance with the approved documents. |
| 3. | Notwithstanding the submitted details, unless otherwise agreed in writing by the Local Planning Authority, the proposed private drive shall be maintained in perpetuity at a minimum width of 4.2 metres for a minimum distance of 10 metres as measured from the near edge of the highway carriageway and shall be constructed perpendicular to the highway carriageway for that said distance,
The reason for the condition is:-
In the interest of highway safety and traffic movement. |
| 4. | Prior to the first occupation of the dwelling hereby permitted the proposed access, on-site car parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is:-
To ensure the permanent availability of the parking/manoeuvring area, in the interests of highway safety. |
| 5. | Notwithstanding the provisions of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015, (or any Order revoking, amending or re-enacting that Order) no gates, bollard, chain or other means of obstruction shall be erected across the approved access unless details have first been submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
In the interests of highway safety. |
| 6. | Demolition and construction work shall not take place outside the following hours:-
07:30 to 18:00 Monday to Friday
08:00 to 13:00 Saturday
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 7. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the aims of Policies CS1, CS2 and CS11 of the Great Yarmouth Local Plan: Core Strategy and saved Policy HOU7 of the Great Yarmouth Borough-wide Local Plan. |
| 8. | NOTES - Please read the following notes carefully:-
The Environmental Health Officer has made the following comments which should be taken into account prior to and during the course of construction :-
Local Air Quality:
The site will potentially generate a significant amount of dust during the construction process; therefore, the following measures should be employed:-
· An adequate supply of water shall be available for suppressing dust;
· Mechanical cutting equipment with integral dust suppression should be used;
· There shall be no burning of any materials on site.
Contaminated land- Pre-Screening Assessment:
Prior to any planning approval the developer should submit the pre-screening assessment form designed for small developments so that environmental services can assess it and give final recommendations prior to approval. |
| 9. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
It is confirmed that this shadow HRA submitted by the applicant has been assessed as being suitable for the Borough Council as competent authority to use as the HRA record for the determination of the planning application, in accordance with the Conservation of Habitats and Species Regulations 2017.
In this instance the Borough Council has considered there is no likely significant effect on protected habitats arising solely from the development itself; and the development would contribute to the overall in-combination significant adverse effect identified by the Habitats Regulations Assessment Report for the Local Plan Core Strategy, but this effect can be adequately mitigated by the Habitats Monitoring and Mitigation Strategy; and that Strategy requires a payment of £110 per each additional dwelling towards the monitoring and mitigation provided through that Strategy. |