| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the details contained in the planning application forms and drawing no. 648 . 1A received by the Local Planning Authority on 28th August 2019 and the revised drawing no. 648 . 2A received on 30th September 2019.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | Prior to the commencement of development of any of the dwellings hereby approved, a surface water drainage scheme shall be submitted to and approved by the Local Planning Authority. The surface water drainage scheme shall include details of infiltration tests and mitigation measures. The surface water drainage scheme shall be completed in accordance with the approved details prior to the first occupation of either of the dwellings hereby approved.
The reason for the condition is :-
To ensure that all surface water drains on site and does not flow onto the highway or neighbouring properties. |
| 4. | No development shall take place until the following information has been submitted to and approved in writing by the Local Planning Authority:
(i) a full site survey showing:- the datum used to calibrate the site levels; levels along all site boundaries; levels across the site at regular intervals and floor levels of adjoining buildings.
(ii) full details of the proposed finished floor levels of all buildings and hard surfaces.
The development shall be carried out only in accordance with the approved details.
The reason for the condtions is:-
To ensure that the development takes place in the manner contemplated by the Local Planning Authority and to retain control over any significant changes in levels within the site. |
| 5. | Prior to the first occupation of the dwellings hereby permitted, the proposed access, on-site car parking and turning areas shall be provided in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking/manoeuvring areas, in the interests of highway safety. |
| 6. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order) no windows or other openings (except those shown on the approved drawings) shall be inserted into the roofs or walls of the dwellings above ground floor level without the prior consent of the Local Planning Authority.
The reason for the condition is:-
In the interests of reducing overlooking of existing neighbouring properties. |
| 7. | Construction work shall not take place outside the following hours:-
07:30 to 18:00 Monday to Friday
08:30 to 13:30 Saturday
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 8. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the aims of Policies CS1, CS2, CS3 and CS9 of the Great Yarmouth Local Plan: Core Strategy and saved policies HOU7 and HOU17 of the Great Yarmouth Borough-Wide Local Plan. |
| 9. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |