1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is:- Required to be imposed pursuant to Section 18 of the Planning (Listed Building and Conservation Areas) Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the revised package of plans received by the Local Planning Authority on 3rd April 2020. The reason for the condition is :- For the avoidance of doubt.
3.Should works not foreseen arise as a result of the requirements of the building regulations with particular reference to reinforcement of the existing ground slab or the provision of foundations not shown on the plan further application formally or informally shall be made to the local planning authority for these works. Any agreed works shall be conducted in the agreed manner, retained and maintained thereafter. Reason: This is a highly sensitive historic site where ground disturbance not foreseen will require referral to the County Archaeologist, and additional works will require specialist historic building advice. Some conceivable changes might have flood resilience implications.
4.Any works of repair to the existing windows and doors shall use materials, techniques, details and finishes to replicate the existing fabric. All rainwater goods and any external soil pipes where replaced shall be in either cast iron or cast aluminium, painted black. The reason for the condition is :- To reflect the historic character of the building.
5.The new floor shall be constructed from softwood planks, plain edge or tongue and grooved depending upon noise and fire transmission criteria under the building regulations, and not from flooring grade chipboard. The reason for the condition is :- To ensure suitable materials for interventions within a listed building are employed.