| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development hereby permitted shall be carried out in accordance with the submitted application form and drawings received on 18 July 2019 by the Local Planning Authority and shall be retained in the approved form thereafter. No material variation from these plans shall take place unless otherwise first agreed in writing with the Local Planning Authority.
The reason for the condition is :-
In order that the development hereby permitted shall be fully implemented in complete accordance with the approved plans and to accord with the Great Yarmouth Borough-Wide Local Plan. |
| 3. | Any access gates/bollard/chain/other means of obstruction shall be hung to open inwards set back, and thereafter retained a minimum distance of 5 metres from the near channel edge of the adjacent carriageway. Any sidewalls/fences/hedges adjacent to the access shall be splayed as shown an the approved plans from each of the outside gateposts to the front boundary of the site.
The reason for the condition is :- In the interest of highway safety enabling vehicles to safely draw off the highway before the gates/obstruction is opened. |
| 4. | Prior to the commencement use of the hereby permitted the vehicular access indicated for improvement on the approved plans shall be upgraded/widened to a minimum width of 7.5 metres in accordance with the Norfolk County Council residential access construction specification for the width of the footway(public highway) as measured back from the near channel edge of the adjacent carriageway. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.
The reason for the condition is :- To ensure construction of a satisfactory access and to avoid carriage of extraneous material or surface water from or onto the highway in the interest of highway safety and traffic movement. |
| 5. | No part of the proposed structure (the brick wall ,including its foundations) shall overhang or encroach upon highway land.
The reason for the condition is :- In the interest of highway safety. |
| 6. | Construction work shall not take place outside the following hours:- 08:00 to 18:00 Monday to Friday, 08:30 to 13:30 Saturday and no work shall take place on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property).
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 7. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria for domestic additions set out in saved Policy HOU18 of the Great Yarmouth Borough-Wide Local Plan. |
| 8. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner. |
| 9. | NOTES - Please read the following notes carefully:-
1 . This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing.
It is an OFFENCE to carry out any works within the Public Highway ,which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the Applicant's responsibility to ensure that in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained form the County Council. Advice on this matter can be obtained from the County Council's Highway Design and Development Group. Please contact Stuart French on 01603638070.
If required ,street furniture will need to be repositioned at the Applicant's own expense.
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.
2. This proposal involves excavations adjacent to the public highway. It is an OFFENCE to carry out any works that may affect the Public Highway ,which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the Applicant's responsibility to ensure that in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained form the County Council. Advice on this matter can be obtained from the County Council. Please contact the area Co-ordinator Streetworks (North) on 0344 800 8020.
3. It is the applicant's responsibility to clarify the boundary with the public highway. Private structures such as fences or walls will not be permitted on highway land. The highway boundary may not match the applicant's title plan. For further details please contact the highway research team at highway.boundaries@norfolk.gov.uk |