| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is:-
Required to be imposed pursuant to Section 18 of the Planning (Listed Building and Conservation Areas) Act 1990. |
| 2. | The development shall be carried out in accordance with the latest plan 6944 01 revision T received the Local Planning Authority on 17.9.20 and elevation 02F received by the Local Planning Authority on 17.9.20. (The upper version of the north west elevation showing drying openings to the drying area and lightweight infill columns to avoid archaeological impact is the approved version).
The reason for the condition is :- For the avoidance of doubt. |
| 3. | Any mortar used in the making good of masonry in the western part of the building, the three storey part, shall use lime mortar without cement, either hydraulic or lime putty, with a sand or other bulking element such as ground chalk aggregate, chosen to provide a match to the material used originally in the construction. Pointing shall be struck so as to match the original construction
The reason for the condition is :- To ensure all making good is carried out in a seamless manner given the listed status of the heritage asset. |
| 4. | Before works to the roof are undertaken further details of the proposed junction between the clay pantiled roof and the flat roofed area and details of ridge tiles flashings including back gutters and rainwater goods shall be submitted in writing with either product information sheets including sample photographs or physical samples provided on site for inspection (whilst maintaining social distancing). The works shall be implemented in the agreed form and retained thereafter.
Reason: To protect the fabric and setting of the listed building. |
| 5. | The final finish colour for the new aluminium sliding sash windows and the wall render (notwithstanding the description given as "cream") shall be agreed with the Local Planning Authority before orders are placed for this element of the work.
The reason for the condition is:- For the satisfactory visual appearance of the building
Note that the drawings show no replacement of existing windows and these can be repaired without listed building consent being required where only small elements need replacement. Anything beyond this will require listed building consent. If work to address traffic noise required by the planning permission 06/19/0302/F requires sound insulation work to be conducted this will need to be agreed by the mechanism of a further listed building consent application. |
| 6. | During the works, if hidden historic features are revealed they should be retained in-situ. Works shall be halted in the relevant area of the building and the Local Planning Authority should be notified immediately. Failure to do so may result in unauthorised works being carried out. Particular regard must be given to the following areas:
o North-east area where a new extension is expected to be built.
o Any part of the interior of the listed building
Reason: To ensure that special regard is paid to protecting the special architectural and historic interest and integrity of the building and its wider setting. |
| 7. | All new external and internal works and finishes and works of making good to the retained fabric, shall match the existing original historic work in respect of methods, detailed execution and finished appearance unless otherwise approved in writing by the Local Planning Authority.
Reason: To ensure that special regard is paid to protecting the special architectural and historic interest and integrity of the building |