| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the following revised plans received by the Local Planning Authority as listed below:-
Drawing Number - 101 Location Plan Received 06/05/2019
Drawing Number - 102 Rev A Proposed Site Plan Received 06/09/2019
Drawing Number - 103 Rev C Proposed Gnd Floor Plan Received 14/01/2020
Drawing Number - 104 Rev C Proposed 1st Floor Plan Received 14/01/2020
Drawing Number - 105 Rev B Proposed 2nd Floor Plan Received 06/09/2019
Drawing Number - 106 Proposed North Elevation Received 06/05/2019
Drawing Number - 107 Proposed South Elevation Received 06/05/2019
Drawing Number - 108 Proposed E/W Elevation Received 06/05/2019
Drawing Number - 109 Proposed Rear Elevation Received 06/05/2019
Drawing Number - 110 Proposed Rear 5/6 Elevation Received 14/01/2020
The reason for the condition is:-
For the avoidance of doubt. |
| 3. | No development shall take place until an archaeological written scheme of investigation has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and 1) The programme and methodology of site investigation and recording, 2) The programme for post investigation assessment, 3) Provision to be made for analysis of the site investigation and recording, 4) Provision to be made for publication and dissemination of the analysis and records of the site investigation, 5) Provision to be made for archive deposition of the analysis and records of the site investigation and 6) Nomination of a competent person or persons/organization to undertake the works set out within the written scheme of investigation.
To ensure that there is no disturbance to sensitive archaeology that might exist at the site. |
| 4. | No development shall take place other than in accordance with the written scheme of investigation approved under condition (4).
To ensure that there is no disturbance to sensitive archaeology that might exist at the site. |
| 5. | The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the archaeological written scheme of investigation approved under condition (4) and the provision to be made for analysis, publication and dissemination of results and archive deposition has been secured.
To ensure that there is no disturbance to sensitive archaeology that might exist at the site. |
| 6. | Construction work shall not take place outside the following hours:-
08:00 to 18:00hrs in any one day Monday to Friday
08:30 to 13:30 Saturday
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings.. |
| 7. | No work shall commence above floor-slab/d.p.c level, until the exact types and colours of the materials have been submitted to and approved by the Local Planning Authority. The materials shall include:-
The brick manufacturer, product type and colour, and method of coursing/brick bond;
The tile manufacturer, product type and colour;
The window and door design, construction material and final-finish/colour;
The eaves/verge and ridge detail;
Gutter and fall-pipe specification' and
Boundary Treatment.
The development shall be carried out using the agreed materials.
The reason for the condition is :-
In the interests of the visual amenities of the area as precise details of the materials have not been submitted. |
| 8. | No work shall commence above floor-slab/d.p.c level, until a scheme for the provision of bat-boxes, to be incorporated in to the construction of the dwellings has been submitted to and approved in writing by the Local Planning Authority.
The development shall be carried out in accordance with he approved scheme, and shall be retained in the agreed form thereafter.
The reason for the condition is :-
In order to ensure that adequate provision is made within the scheme for bat-roosts in the interest of maintaining biodiversity and suitable habitat for protected species. |
| 9. | No part of the proposed structure (to include fascia board/rainwater guttering) shall overhang or encroach upon highway land and no gate/ door/ground floor window shall open outwards over the highway.
The reason for the condition is :-
In the interests of highway safety. |
| 10. | Prior to the first occupation of the development hereby approved, the proposed on-site cycle storage shall be provided as shown on the approved plans and shall thereafter be made available for the intended use.
The reason for the condition is :- In order to provide cycle parking to meet the needs of the occupants of the development, and in the interest of satisfactory development and encouraging the use of sustainable modes of transport. |
| 11. | It is the applicant's responsibility to clarify the boundary with the public highway. Private structures such as fences or walls will not be permitted on highway land. The highway boundary may not match the applicants title plan. For further details please contact the highway research team at highway.boundaries@norfolk.gov.uk for further details. |
| 12. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, discussing amendments with the applicant/agent and securing revised plans to make the scheme acceptable.
It is confirmed that this shadow HRA submitted by the applicant has been assessed as being suitable for the Borough Council as competent authority to use as the HRA record for the determination of the planning application, in accordance with the Conservation of Habitats and Species Regulations 2017.
In this instance the Borough Council has considered there is no likely significant effect on protected habitats arising solely from the development itself; and the development would contribute to the overall in-combination significant adverse effect identified by the Habitats Regulations Assessment Report for the Local Plan Core Strategy, but this effect can be adequately mitigated by the Habitats Monitoring and Mitigation Strategy; and that Strategy requires a payment of £110 per each additional dwelling towards the monitoring and mitigation provided through that Strategy. |
| 13. | Comments of County Archaeologist.
A brief for the archaeological work can be obtained from Norfolk County Council Environment Service historic environment strategy and advice team. We now charge applicants for the elements of our involvement on planning case not covered by our service level agreements with local planning authorities. |
| 14. | NOTES - Please read the following notes carefully:-
Great Yarmouth Borough Council has a duty to ensure that roads and streets within the Borough are properly named and that the properties fronting onto them are appropriately numbered. Therefore it is essential that once planning permission has been granted, and prior to the completion of development, the developer/owner applies for an official address. This Authority has adopted the legislation set out in sections 17, 18 and 19 of The Public Health Act 1925. In common with most neighbouring local authorities, Great Yarmouth Borough Council is introducing charging for the street naming and numbering of new developments from the 1st January 2020. Charges and more information can be seen on the Council's website here: https://www.great-yarmouth.gov.uk/street-naming-numbering |
| 15. | NOTES - Please read the following notes carefully:-
The site is one that may contain potential for bat-roosts either on the site or in close proximity to te proposed dvelopemnt.
It is an offence to harm a bat (which are protected species) or impact on a bat roost.
Conditions on the above planning permission require alternative bat-roosts - in the form of bat-bricks - to be incorporated in to the construction of the buildings - a scheme to be agreed in writing by the Local Planning Authority. |