No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the plans and forms received by the Local Planning Authority on 9th October 2018. The reason for the condition is :- For the avoidance of doubt.
3.Prior to the first occupation/use of the development hereby permitted the vehicular access shall be constructed in accordance with the highways specification (TRAD 5 attached) and thereafter retained at the position shown on the approved plan (Drg No 18-103 102B). Arrangement shall be made for surface water drainage to be intercepted and disposal of separately so that it does not discharge from or onto the highway. The reason for the condition is :- To ensure construction of a satisfactory access and to avoid carriage of extraneous material or surface water from or onto the highway in the interests of highway safety.
4.Any access gates/bollard/chain/other means of obstruction shall be hung to open inwards, set back, and thereafter retained a minimum distance of 5 metres from the near channel edge of the adjacent carriageway. Any sidewalls/fences/hedges adjacent to the access shall be splayed at an angle of 45 degrees from each of the outside gateposts to the front boundary of the site. The reason for the condition is :- In the interests of highway safety enabling vehicles to safely draw off the highway before the gates/obstruction is opened.
5.Vehicular/pedestrian/cyclist access to and egress from the adjoining highway shall be limited to the access shown on Drg No 18-103 102B only. Any other access or egress shall be permanently closed, and the highway verge shall be reinstated in accordance with a detailed scheme to be agreed with the Local Planning Authority concurrently with the bringing into use of the new access. The reason for the condition is :- In the interests of highway safety.
6.Prior to the first occupation of the development hereby permitted the proposed access on-site car parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. reason for the condition is :- To ensure the permanent availability of the parking/manoeuvring areas, in the interests of satisfactory development and highway safety.
7.Construction work shall not take place outside the following hours:- 08:00 to 18:00 Monday to Friday 08:30 to 13:30 Saturday and no work shall take place on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property) The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
8.Prior to the commencement of the development and to the satisfaction of the Environmental Services Manager, a Phase 1 contamination report shall be carried out to assess whether the land is likely to be contaminated. The report shall also include details of known previous uses and possible contamination arising from those uses. If contamination is suspected to exist, a Phase 2 site investigation is to be carried out to the satisfaction of the Environmental Services Manager. If the Phase 2 site investigation determines that the ground contains contaminants at unacceptable levels then the applicant is to submit a written strategy detailing how the site is to be remediated to a standard suitable for its proposed end-use to the Environmental Services Manager. No buildings hereby permitted shall be occupied until the remediation works agreed within the scheme have been carried out to the satisfaction of the Local Planning Authority. The reason for the condition is :- To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
9.In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until: 1) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and 2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority. The reason for the condition is :- To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
10.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
11.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria set out in saved Policy CS2 of the Great Yarmouth Borough Core Strategy.
12.This development involves work to the public highway that will require the approval of the County Council as Highway Authority. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Area Managers based at (insert appropriate area contact details). Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.