No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the application form received by the Local Planning Authority on 12 September 2018, the revised plan (drawing reference: 1287/2) received by the Local Planning Authority on 21 September 2018 and the correspondence received by the Local Planning Authority on the 14 December 2018. The reason for the condition is :- For the avoidance of doubt.
3.Construction work shall not take place outside the following hours:- 07:30 to 18:00 Monday to Friday 08:00 to 13:00 Saturday and no work shall take place on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property) The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
4.In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until: 1) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and 2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority. The reason for the condition is :- To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
5.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order) the dwelling hereby approved shall not be extended in any way without the prior consent of the Local Planning Authority. The reason for the condition is:- To enable the Local Planning Authority to retain control over any extensions to the dwellings in the interests of residential amenity.
6.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria outlined in saved policy HOU7 of the Borough Wide Local Plan and policy CS9 of the adopted Core Strategy.
7.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner.
8.NOTES - Please read the following notes carefully:- Local Air Quality The site will potentially generate a significant amount of dust during the construction process; therefore, the following measures should be employed. An adequate supply of water shall be available for suppressing dust Mechanical cutting equipment with integral dust suppression should be used; There shall be no burning of any materials on site Asbestos The developer must carry out an asbestos survey prior to the demolition of the building in order to identify asbestos containing materials (ACMs). The developer has a legal duty to remove most ACMs before demolition and some ACMs must be removed by contractors licensed by the Health and Safety Executive (HSE). If at any stage during demolition is suspected the work should be stopped and the material investigated. Roof Ridge The plans show the ridge line matching that of the neighbouring property. The proposed replacement dwelling should be built in accordance with the approved plan meaning the ridge should align with the neighbour. Party Wall Act Prior to undertaking any work you should be aware of your obligations under the party wall act. Demolition Prior to the demolition of the existing structure a demolition notice must be submitted to the Local Authority Building Control Department.