| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the application form and approved elevation plans received by the Local Planning Authority on 11 June 2018 and the revised block plan received by the Local Planning Authority on the 20 August 2018.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | Prior to the first occupation of the development hereby permitted a 2.0 metre wide parallel visibility splay (as measured back from the near edge of the adjacent highway carriageway) shall be provided across the whole of the site's roadside frontage (orchard Court) for plots 6, 7 and 8. The parallel visibility splay shall thereafter be maintained at all times free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway.
The reason for the condition is :-
In the interests of highway safety. |
| 4. | Prior to the first occupation of the development hereby permitted the proposed access, on-site car parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking/manoeuvring area, in the interests of highway safety. |
| 5. | No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of landscaping, which shall include indications of all existing trees and hedgerows on the land, and details of any to be retained, together with measures for their protection in the course of development.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 6. | All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the occupation of the buildings or the completion of the development, whichever, is the sooner, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 7. | Prior to the commencement of development of any of the dwellings hereby approved a surface water drainage scheme shall be submitted to and approved by the Local Planning Authority. The surface water drainage scheme shall include details of infiltration tests and mitigation measures. The surface water drainage scheme shall be completed prior to the first occupation of any dwelling hereby approved.
The reason for the condition is :-
To ensure that all surface water drains on site and does not flow onto the highway or neighbouring properties. |
| 8. | Construction work shall not take place outside the following hours:-
07:30 to 18:00 Monday to Friday
08:30 to 13:30 Saturday
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 9. | No development shall take place until the following information has been submitted to and approved in writing by the
Local Planning Authority:
(i) a full site survey showing:
the datum used to calibrate the site levels
levels along all site boundaries
levels across the site at regular intervals
floor levels of adjoining buildings
(ii) full details of the proposed finished floor levels of all buildings and hard surfaces.
The development shall be carried out only in accordance with the approved details.
No development shall take place until full details of the finished levels, above ordnance datum, of the ground floors of the proposed buildings, in relation to existing ground levels have been submitted to and approved by the Local Planning Authority. The development shall be carried out in strict accordance with the levels approved.
The reason for the condtions is:-
To ensure that the development takes place in the manner contemplated by the Local Planning Authority and to retain control over any significant changes in levels within the site. |
| 10. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order) other than the windows shown on the approved plans no windows shall be inserted into the side elevation of plots 5 and 8 above ground floor level without the prior consent of the Local Planning Authority.
The reason for the condition is:-
In the interests of reducing overlooking upon existing neighbouring properties. |
| 11. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order) the side windows in the first floor of plot 8 shall be obscure glazed and non-opening and shall remain so in perpetuity.
The reason for the condition is:-
In the interests of neighbouring amenity. |
| 12. | Prior to the commencement of the development hereby approved details of the hard surfaces used in the private access shall be submitted to and approved by the Local Planning Authority.
The proposed access and turning head shall be carried out in accordance with the approved details.
The reason for the condition is :-
To ensure a suitable finish of the access. |
| 13. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria outlined in saved policies HOU7 and HOU17 of the Borough Wide Local Plan and policies CS2, CS3 and CS9 of the adopted Core Strategy. |
| 14. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |