| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The materials shall match the exact types and colours of the original building or details in section 10 of the application form unless approved in writing by the Local Planning Authority.
The reason for the condition is :-
In the interests of the visual amenities of the area. |
| 3. | The development shall be carried out in accordance with the plan (DWG.no 820-4/4, 820-3/4, 820 - 2/4, 820-1/4) received by the Local Planning Authority on 9th March 2018.
The reason for the condition is :-
For the avoidance of doubt. |
| 4. | Construction work shall not take place outside the following hours:-
07:30 to 18:00 Monday to Friday
08:30 to 13:30 Saturday
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 5. | NOTES - Please read the following notes carefully:-
The work has the potential to cause a noise nuisance to local residents living nearby the development phase. The applicant should undertake an informal noise assessment of this aspect. This should address issues surrounding, for example, choice of plant, hours of work and deliveries of materials.
Asbestos removal:
Removal of the sheeted asbestos must be carried out by a competent removal company and a full risk assessment and plan of work must be prepared prior to removal. All sheeted asbestos must be removed and disposed of by a licenced waste contractor licenced to carry and dispose of hazardous waste.
Works should be carried out in accordance with HSE Guidance note a14 'Removing asbestos cement (AC) sheets, gutters etc and dismantling a small AC Structure'. I attach the guidance note for information purposes.
Please note that a supply of water with spray facility must be available to dampen down the asbestos structure in order to prevent any airborne dust release.
Local Air Quality:
The site will potentially generate dust during the construction process; therefore, the following measures should be employed:-
· An adequate supply of water shall be available for suppressing dust;
· Mechanical cutting equipment with integral dust suppression should be used;
· There shall be no burning of any materials on site. |
| 6. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria for domestic additions set out in saved Policy HOU18 of the Great Yarmouth Borough-Wide Local Plan. |
| 7. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |