No.Condition Text
1.Condition 3 requires detailed plans of the roads, footways and public rights of way and drainage. The following documents have been submitted: - Engineering Layout Sheet 1 of 4 - IP16_042_02_001 Rev D - Engineering Layout Sheet 2 of 4 - IP16_042_02_002 Rev D - Engineering Layout Sheet 3 of 4 - IP16_042_02_003 Rev D - Engineering Layout Sheet 4 of 4 - IP16_042_02_004 Rev D - Adoptable Highway Construction Details Sheet 1 of 2 - IP16_042_02_009 Rev C - Adoptable Highway Construction Details Sheet 2 of 2 - IP16_042_02_012 Rev A - Private Road Construction Details - IP16_042_02_015 Rev A - Road & Drainage Longsections Sheet 1 of 5 - IP16_042_02_018 Rev E - Road & Drainage Longsection Sheet 2 of 5 - IP16_042_02_019 Rev E - Road & Drainage Longsection Sheet 3 of 5. - IP16_042_02_020 Rev B - Road & Drainage Longsection Sheet 4 of 5 - IP16_042_02_021 Rev C - Road Drainage Longsections Sheet 5 of 5 - IP16_042_02_022 Rev C - Section 38 Agreement - - IP16_042_02_038 Rev E The submitted information is acceptable and is hereby approved and satisfies the submission element of condition 3. The agent has confirmed that the development has been built in accordance with these details. As the site has been constructed, this condition can be discharged.
2.Condition 8 requires a detailed scheme of off-site highway improvement works. The following documents have been submitted: - Section 278 Agreement Sheet 1 of 2 - IP16_042_02_027 Rev E - Section 278 Works Construction Details - IP16_042_02_029 Rev C - Section 278 Agreement Sheet 2 of 2 - IP16_042_02_032 Rev B The submitted information is acceptable and is hereby approved and satisfies the submission element of condition 8. The agent has confirmed that the development has been built in accordance with these details. As the site has been constructed, this condition can be discharged.
3.Condition 13 requires details of foul and surface water drainage. The following documents have been submitted: - Flood risk and foul & storm water drainage assessment, July 2015 - 051/2014/FRA; (South west corner of site) plan IP16_042_02_046 Rev B - Flood Risk and Drainage Strategy Addendum (Rev A) - Contours Plan; dwg. no. IP16-042-02-046 - Exceedance Routes; dwg. IP16-042-02-045 Rev B The submitted information is acceptable and is hereby approved and satisfies the submission element of condition 13. The agent has confirmed that the development has been built in accordance with these details. As the site has been constructed, this condition can be discharged.
4.Condition 17 requires details of pedestrian link and pedestrian and cycle link. The following documents have been submitted: - Engineering Layout Sheet 1 of 4 - IP16_042_02_001 Rev K - Engineering Layout Sheet 2 of 4 - IP16_042_02_002 Rev D - Engineering Layout Sheet 3 of 4 - IP16_042_02_003 Rev J - Engineering Layout Sheet 4 of 4 - IP16_042_02_004 Rev H - Adoptable Highway Construction Details Sheet 2 of 2 The submitted information is acceptable and is hereby approved and satisfies the submission element of condition 17. The agent has confirmed that the development has been built in accordance with these details. As the site has been constructed, this condition can be discharged.