| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the details contained in the planning application forms and drawing no. 1429 rev. C received by the Local Planning Authority on 27th November 2017.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | Prior to the first use of the building hereby permitted, the vehicular access (indicated for improvement on drawing no. 1429 Rev. C) shall be upgraded/widened to a minimum width of 3 metres in accordance with the Norfolk County Council field access construction specification for the first 7 metres as measured back from the near channel edge of the adjacent carriageway. Arrangement shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge onto the highway carriageway.
The reason for the condition is :-
In the interest of highway safety and traffic movement. |
| 4. | The gradient of the vehicular access shall not exceed 1:12 for the first 7 metres into the site as measured from the near channel edge of the adjacent carriageway.
The reason for the condition is :-
In the interests of the safety of persons using the access and users of the highway. |
| 5. | Prior to the first use of the building hereby permitted, any access gate(s), bollard, chain or other means of obstruction shall be hung to open inwards, set back and thereafter maintained a minimum distance of 7 metres from the near channel edge of the adjacent carriageway.
The reason for the condition is :-
To enable vehicles to safely draw off the highway before the gate(s) or obstruction is opened. |
| 6. | Prior to the first use of the building permitted, the proposed access/on-site parking/servicing/turning area shall be provided in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking/manoeuvring area, in the interests of highway safety. |
| 7. | The hedge planting shown on the approved drawing no. 1429 Rev. C shall be carried out within three months of the completion of the building. All plants that die within 3 years shall be replaced within one year by the applicants or their successors in title.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 8. | Except where removal is necessary to allow construction of the new vehicular access, the existing hedge along the front of the application site shall be retained.
The reason for the condition is :-
In the interests of the visual amenities of the locality. |
| 9. | Construction work shall not take place outside the following hours:-
07:30 to 18:00 Monday to Friday
08:00 to 13:00 Saturday
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 10. | Notwithstanding the provisions of the Town and Country Planning Use Classes Order 1987 and the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Orders revoking or re-enacting those Orders) the building hereby approved shall only be used for agricultural purposes and shall not be used for any other purpose without the prior consent of the Local Planning Authority.
The reason for the condition is:-
To enable the Local Planning Authority to retain control over the use of the building. |
| 11. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the aims of Policy CS6 of the Great Yarmouth Local Plan: Core Strategy. |
| 12. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |